Company · the network on the Danish continental shelf

Nordsøfonden

Nordsøfonden holds stakes in 16 fields on the Danish continental shelf. The map shows how the fields connect to facilities, pipelines and landfall.

Show on the globeDenmark: all fields and companies

Calculated equity production, last 12 months, 1 of 2 fields and licences with production
1.34 million Sm³ o.e.
Estimate · Sep 2025–Aug 2026 · DEA · 8 Oct 2026
Per day
23,000 barrels o.e./day
Estimate · Sep 2025–Aug 2026 · DEA · 8 Oct 2026
Share of production in Denmark
18.1%
Estimate · Sep 2025–Aug 2026 · DEA · 8 Oct 2026
Fields with a stake
16
DEA · 8 Oct 2026
Licences with a share or operatorship
5
DEA · 8 Oct 2026

Estimate: Calculated by OESA, not figures from the company: for each field (or each licence where both the shares and the production are per licence) the share that applied in each month is multiplied by the production from DEA (Sep 2025–Aug 2026), converted to oil equivalent and summed over 1 field or licence. Some shares are stated as of 8 Oct 2026 and may have differed earlier in the period. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. Converted from Nm³ (0 °C) to Sm³ (15 °C): × 1.0549 (288.15/273.15). Not included in the sum: one field where the share and the production are not at the same level (licence against field). The figure applies in Denmark and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Estimate: The calculated equity production divided by the total for all fields in the source (Sep 2025–Aug 2026), both in oil equivalent.

Attribution: Source: Danish Energy Agency (Energistyrelsen)

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in ENS data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Nordsøfonden16 fields with a stake
Field and shareDEA · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareHalfdan 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 1.53 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareHarald 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 1.06 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareDan 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.97 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareTyra 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.88 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareValdemar share not statedA share in a concession is not a field share.field 0.67 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareTyra SE 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.62 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareSkjold 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.44 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareSolsort share not statedA licence share is not a field share.field 0.25 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareGorm 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.23 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareRoar 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.21 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 16Show fewer
  1. Field and shareKraka 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.084 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareRolf 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.field 0.023 million Sm³ o.e. Sep 2025–Aug 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareDagmar 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareHejre 20% in licence 1/06 (Hejre Field)A licence share is not a field share.
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareRegnar 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareSvend 20% in concession Sole Concession of 8 July 1962A share in a concession is not a field share.
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Licences

The licences where Nordsøfonden holds a share or is the operator. A licence share is not a field share.

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for Denmark

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.