Company · the network on the Norwegian shelf
ORLEN
ORLEN holds stakes in 39 fields on the Norwegian shelf. The map shows how the fields connect to pipelines, landfall and markets, and which 1 rigs have drilled for the company in the last three years.
- Calculated equity production
- 5.88 million Sm³ o.e.
- Estimate · Oct 2025–Sep 2026 · Sodir, production · 23 Nov 2026
- Pipeline systems and plants where the company has a stake or operates the system or parts of it
- 11
- Sodir, pipeline systems and plants · 23 Nov 2026
Estimate: Calculated by OESA, not figures from the company: for each field the company's current share is multiplied by the field's marketable production (Oct 2025–Sep 2026) from the Norwegian Offshore Directorate, and the results are summed. 1 Sm³ o.e. = 6.29 barrels; rounded to the nearest 1,000 above 10,000, the nearest 100 above 1,000 and the nearest 10 above 100.
The network
From owner to market. Links without their own label have their source in the column heading; curated, derived and possible links are labelled at the link.
- The colour shows the content:
- Gas
- Oil
- Condensate
- CO₂
- Oil and condensate
- The line shows the source:
- pipeline in Sodir data
- curated from Sodir's field description
- possible onward route, not measured flow
- planned or not in service
The links show direction, not volume.
- Field and shareTommeliten A 42.20% unchanged since 8 Jul 2022field 2.88 million Sm³ o.e. last 12 mo · company's part ≈ 1.21 million Sm³ o.e. (estimate)Facilities and pipelines
2 subsea facilities in service
Processed at Ekofisk
- Norpipe Gassledning gas · 36″ · onward to Emden · 4 sections
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections
Landfall- Emden Germany · gas derived
- Teesside United Kingdom · oil derived
Market- Emden Germany · ENTSOG point
The buyers of the oil are not in the data.
- Field and shareOrmen Lange 14.02% unchanged since 30 Sep 2021field 8.24 million Sm³ o.e. last 12 mo · company's part ≈ 1.16 million Sm³ o.e. (estimate)Facilities and pipelines
7 subsea facilities in service (3 without a position at Sodir, not shown on the globe)
- Ormen Lange PL-A gas · 30″
- Ormen Lange PL-B gas · 30″
Landfall- Nyhamna Norway · gas
- Loaded onto ships condensate · from Nyhamna curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Easington United Kingdom
- Zeebrugge Belgium
- Dunkerque France
- Emden Germany
The receivers of the cargoes are not in the data.
- Field and shareGina Krog 41.30% unchanged since 18 Jun 2024field 2.26 million Sm³ o.e. last 12 mo · company's part ≈ 0.93 million Sm³ o.e. (estimate)Facilities and pipelines
Gina Krog 1 facility in service
- Gina Krog – Sleipner A oil · 10.75″
- Gina Krog Gasseksport gas · 20″
- Gina Krog Gassimport gas · 16″ · in from Gina Krog T
- Sleipner Kondensatrør condensate · 20″ · onward to Kårstø derived
Landfall- Kårstø Norway · condensate derived
Market- Possible routes for the gas
- Easington United Kingdom
- Zeebrugge Belgium
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareSkarv 11.92% unchanged since 18 Dec 2007field 6.90 million Sm³ o.e. last 12 mo · company's part ≈ 0.82 million Sm³ o.e. (estimate)Facilities and pipelines
Skarv FPSO 13 facilities in service, 12 on the seabed
- Skarv Gassrør gas · 26″
- Åsgard Transport gas · 42″ · onward to Kårstø derived
Landfall- Kårstø Norway · gas derived
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareDuva 30.00% unchanged since 3 Feb 2020field 1.32 million Sm³ o.e. last 12 mo · company's part ≈ 0.40 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Gjøa curated, Sodir 20 Feb 2026
- Gjøa Gassrør gas · 28″ · onward to Gjøa-T
- Gjøa Oljerør oil · 16″ · onward to Tor II Y
- Troll Oljerør II oil · 20″ · onward to Mongstad derived
Landfall- Mongstad Norway · oil derived
- St Fergus United Kingdom · gas · via FLAGS curated, Sodir 20 Feb 2026
MarketThe buyers of the oil are not in the data.
- Field and shareSleipner Vest 24.41% unchanged since 18 Jun 2024field 1.23 million Sm³ o.e. last 12 mo · company's part ≈ 0.30 million Sm³ o.e. (estimate)Facilities and pipelines
Sleipner B, Sleipner T 3 facilities in service, 1 on the seabed
Processed at Sleipner Øst
- Langeled gas · 44″ · onward to Easington
- Sleipner Kondensatrør condensate · 20″ · onward to Kårstø
- Zeepipe I gas · 40″ · onward to Draupner S · 3 sections
Landfall- Easington United Kingdom · gas
- Kårstø Norway · condensate
- Zeebrugge Belgium · gas derived
Market- Easington United Kingdom · ENTSOG point
- Zeebrugge (ZPT) Belgium · ENTSOG point
- Possible routes for the gas
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareAlve 15.00% unchanged since 30 Sep 2021field 1.28 million Sm³ o.e. last 12 mo · company's part ≈ 0.19 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Norne curated, Sodir 20 Feb 2026
- Norne Gasstransport gas · 16″ · onward to Norne/Heidrun T curated, Sodir 20 Feb 2026
- Åsgard Transport gas · 42″ · onward to Kårstø curated, Sodir 20 Feb 2026
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareEirin 41.30% unchanged since 31 Oct 2024field 0.40 million Sm³ o.e. last 12 mo · company's part ≈ 0.17 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Gina Krog
- Gina Krog – Sleipner A oil · 10.75″ · onward to Sleipner A
- Gina Krog Gasseksport gas · 20″ · onward to Sleipner A
- Sleipner Kondensatrør condensate · 20″ · onward to Kårstø derived
Landfall- Kårstø Norway · condensate derived
Market- Possible routes for the gas
- Easington United Kingdom
- Zeebrugge Belgium
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareKvitebjørn 6.45% unchanged since 31 Dec 2020field 2.44 million Sm³ o.e. last 12 mo · company's part ≈ 0.16 million Sm³ o.e. (estimate)Facilities and pipelines
Kvitebjørn 1 facility in service
- Kvitebjørn Gassrør gas · 30″
- Kvitebjørn Oljerør condensate · 16″
- Valemon Kondensatrør condensate · 8″ · in from Valemon
- Troll Oljerør II oil · 20″ · onward to Mongstad derived
Landfall- Kollsnes Norway · gas
- Mongstad Norway · oil derived
Market- Possible routes for the gas
- Easington United Kingdom
- Dunkerque France
- Zeebrugge Belgium
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareYme 20.00% unchanged since 2 May 2023field 0.61 million Sm³ o.e. last 12 mo · company's part ≈ 0.12 million Sm³ o.e. (estimate)Facilities and pipelines
Inspirer, Yme WHM, Yme SLS 5 facilities in service, 2 on the seabed
Landfall- Loaded onto ships oil curated, Sodir 20 Feb 2026
- Injected into the reservoir gas curated, Sodir 20 Feb 2026
MarketThe receivers of the cargoes are not in the data.
Show all 39 fieldsShow fewer
- Field and shareTyrving 11.95% unchanged since 23 Jan 2025field 0.96 million Sm³ o.e. last 12 mo · company's part ≈ 0.11 million Sm³ o.e. (estimate)Facilities and pipelines
3 subsea facilities in service
Processed at Alvheim curated, Sodir 20 Feb 2026
- Alvheim Rikgassrør gas · 14″ · onward to SAGE-T
Landfall- Loaded onto ships oil curated, Sodir 20 Feb 2026
- St Fergus United Kingdom · gas · via SAGE curated, Sodir 20 Feb 2026
MarketThe receivers of the cargoes are not in the data.
- Field and shareMarulk 30.00% unchanged since 30 Sep 2021field 0.19 million Sm³ o.e. last 12 mo · company's part ≈ 0.057 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Norne curated, Sodir 20 Feb 2026
- Norne Gasstransport gas · 16″ · onward to Norne/Heidrun T curated, Sodir 20 Feb 2026
- Åsgard Transport gas · 42″ · onward to Kårstø curated, Sodir 20 Feb 2026
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareUtgard 23.56% unchanged since 18 Jun 2024field 0.17 million Sm³ o.e. last 12 mo · company's part ≈ 0.041 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Sleipner Vest
- Langeled gas · 44″ · onward to Easington
- Sleipner Kondensatrør condensate · 20″ · onward to Kårstø
- Zeepipe I gas · 40″ · onward to Draupner S · 3 sections
Landfall- Easington United Kingdom · gas
- Kårstø Norway · condensate
- Zeebrugge Belgium · gas derived
Market- Easington United Kingdom · ENTSOG point
- Zeebrugge (ZPT) Belgium · ENTSOG point
- Possible routes for the gas
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareSkogul 35.00% unchanged since 23 Mar 2018field 0.11 million Sm³ o.e. last 12 mo · company's part ≈ 0.039 million Sm³ o.e. (estimate)Facilities and pipelines
2 subsea facilities in service
Processed at Alvheim curated, Sodir 20 Feb 2026
- Alvheim Rikgassrør gas · 14″ · onward to SAGE-T
Landfall- Loaded onto ships oil curated, Sodir 20 Feb 2026
- St Fergus United Kingdom · gas · via SAGE curated, Sodir 20 Feb 2026
MarketThe receivers of the cargoes are not in the data.
- Field and shareØrn 40.00% unchanged since 28 Jun 2023field 0.091 million Sm³ o.e. last 12 mo · company's part ≈ 0.036 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Skarv curated, Sodir 20 Feb 2026
- Skarv Gassrør gas · 26″ · onward to Åsgard T
- Åsgard Transport gas · 42″ · onward to Kårstø derived
Landfall- Kårstø Norway · gas derived
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareVilje 24.24% unchanged since 30 Dec 2014field 0.12 million Sm³ o.e. last 12 mo · company's part ≈ 0.029 million Sm³ o.e. (estimate)Facilities and pipelines
3 subsea facilities in service
Processed at Alvheim curated, Sodir 20 Feb 2026
- Alvheim Rikgassrør gas · 14″ · onward to SAGE-T
Landfall- Loaded onto ships oil curated, Sodir 20 Feb 2026
- St Fergus United Kingdom · gas · via SAGE curated, Sodir 20 Feb 2026
MarketThe receivers of the cargoes are not in the data.
- Field and shareGungne 25.00% unchanged since 18 Jun 2024field 0.11 million Sm³ o.e. last 12 mo · company's part ≈ 0.029 million Sm³ o.e. (estimate)Facilities and pipelines
No facilities in service at Sodir
Processed at Sleipner Øst
- Langeled gas · 44″ · onward to Easington
- Sleipner Kondensatrør condensate · 20″ · onward to Kårstø
- Zeepipe I gas · 40″ · onward to Draupner S · 3 sections
Landfall- Easington United Kingdom · gas
- Kårstø Norway · condensate
- Zeebrugge Belgium · gas derived
Market- Easington United Kingdom · ENTSOG point
- Zeebrugge (ZPT) Belgium · ENTSOG point
- Possible routes for the gas
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareValemon 3.23% unchanged since 30 Dec 2020field 0.71 million Sm³ o.e. last 12 mo · company's part ≈ 0.023 million Sm³ o.e. (estimate)Facilities and pipelines
Valemon 1 facility in service
Processed at Kvitebjørn
- Valemon Gassrør gas · 22″ · decommissioned
- Valemon Kondensatrør condensate · 8″
- Kvitebjørn Gassrør gas · 30″ · onward to Kollsnes
- Kvitebjørn Oljerør condensate · 16″ · onward to Tor II Y derived
- Troll Oljerør II oil · 20″ · onward to Mongstad derived
Landfall- Kollsnes Norway · gas
- Mongstad Norway · oil derived
Market- Possible routes for the gas
- Easington United Kingdom
- Dunkerque France
- Zeebrugge Belgium
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareÆrfugl Nord 11.92% unchanged since 2 Apr 2024field 0.14 million Sm³ o.e. last 12 mo · company's part ≈ 0.016 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Skarv curated, Sodir 20 Feb 2026
- Skarv Gassrør gas · 26″ · onward to Åsgard T
- Åsgard Transport gas · 42″ · onward to Kårstø derived
Landfall- Kårstø Norway · gas derived
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareSleipner Øst 25.00% unchanged since 18 Jun 2024field 0.058 million Sm³ o.e. last 12 mo · company's part ≈ 0.015 million Sm³ o.e. (estimate)Facilities and pipelines
Sleipner A, Sleipner R, Sleipner FL 5 facilities in service, 2 on the seabed
- Gina Krog – Sleipner A oil · 10.75″ · in from Gina Krog
- Gina Krog Gasseksport gas · 20″ · in from Gina Krog
- Gudrun Gassrør gas · 14″ · in from Gudrun
- Gudrun Oljerør oil · 12″ · in from Gudrun
- Langeled gas · 42″ · in from Nyhamna
- Langeled gas · 44″
- Sleipner Kondensatrør condensate · 20″
- Zeepipe I gas · 40″ · 2 sections
- Zeepipe II A gas · 40″ · in from Kollsnes
- Zeepipe I gas · 40″ · onward to Zeebrugge derived
Landfall- Easington United Kingdom · gas
- Kårstø Norway · condensate
- Zeebrugge Belgium · gas derived
Market- Easington United Kingdom · ENTSOG point
- Zeebrugge (ZPT) Belgium · ENTSOG point
- Possible routes for the gas
- Dunkerque France
- Emden Germany
The buyers of the oil are not in the data.
- Field and shareIdun Nord 11.92% unchanged since 2 Apr 2024field 0.084 million Sm³ o.e. last 12 mo · company's part ≈ 0.010 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Skarv curated, Sodir 20 Feb 2026
- Skarv Gassrør gas · 26″ · onward to Åsgard T
- Åsgard Transport gas · 42″ · onward to Kårstø derived
Landfall- Kårstø Norway · gas derived
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareAlve Nord 11.92% unchanged since 28 Jun 2023field 0.063 million Sm³ o.e. last 12 mo · company's part ≈ 0.007 million Sm³ o.e. (estimate)Facilities and pipelines
1 subsea facility in service
Processed at Skarv curated, Sodir 20 Feb 2026
- Skarv Gassrør gas · 26″ · onward to Åsgard T
- Åsgard Transport gas · 42″ · onward to Kårstø derived
Landfall- Kårstø Norway · gas derived
- Loaded onto ships oil curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Field and shareMorvin 6.00% unchanged since 30 Dec 2014field 0.083 million Sm³ o.e. last 12 mo · company's part ≈ 0.005 million Sm³ o.e. (estimate)Facilities and pipelines
2 subsea facilities in service
Processed at Åsgard curated, Sodir 20 Feb 2026
- Åsgard Transport gas · 42″ · onward to Kårstø curated, Sodir 20 Feb 2026
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026
- Loaded onto ships oil and condensate · from Åsgard A curated, Sodir 20 Feb 2026
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The receivers of the cargoes are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Ekofisk
- Norpipe Gassledning gas · 36″ · onward to Emden · 4 sections
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections
Landfall- Emden Germany · gas derived
- Teesside United Kingdom · oil derived
Market- Emden Germany · ENTSOG point
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Valhall
- Norpipe Gassledning gas · 36″ · onward to Emden · 4 sections
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections
Landfall- Emden Germany · gas derived
- Teesside United Kingdom · oil derived
Market- Emden Germany · ENTSOG point
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
- Statpipe gas · 36″
LandfallNot in the data.
Market- Possible routes for the gas
- Dunkerque France
- Emden Germany
- Facilities and pipelines
No facilities in service at Sodir
- Huldra Gassrør gas · 22″ · decommissioned
- Huldra Kondensatrør condensate · 8″ · abandoned in place
- Valemon Gassrør gas · 22″ · in from Valemon · decommissioned
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
- Hugin A – Yop-Y oil · 24″ · under installation
- Hugin A – Statpipe HTT gas · 28″ · under installation
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026 planned
- Sture Norway · oil curated, Sodir 20 Feb 2026 planned
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Hugin curated, Sodir 20 Feb 2026
- Hugin A – Yop-Y oil · 24″ · onward to Yop-Y · under installation
- Hugin A – Statpipe HTT gas · 28″ · onward to Statpipe HTT · under installation
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026 planned
- Sture Norway · oil curated, Sodir 20 Feb 2026 planned
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Hugin curated, Sodir 20 Feb 2026
- Hugin A – Yop-Y oil · 24″ · onward to Yop-Y · under installation
- Hugin A – Statpipe HTT gas · 28″ · onward to Statpipe HTT · under installation
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026 planned
- Sture Norway · oil curated, Sodir 20 Feb 2026 planned
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
- Frostpipe condensate · 16″ · decommissioned
- Vesterled T gas · 32″ · decommissioned
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Ekofisk
- Norpipe Gassledning gas · 36″ · onward to Emden · 4 sections
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections
Landfall- Emden Germany · gas derived
- Teesside United Kingdom · oil derived
Market- Emden Germany · ENTSOG point
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Ekofisk
- Norpipe Gassledning gas · 36″ · onward to Emden · 4 sections
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections
Landfall- Emden Germany · gas derived
- Teesside United Kingdom · oil derived
Market- Emden Germany · ENTSOG point
The buyers of the oil are not in the data.
- Facilities and pipelines
No facilities in service at Sodir
Processed at Ula curated, Sodir 20 Feb 2026
- Norpipe Oljeledning oil · 34″ · onward to Teesside · 3 sections derived
- Ula Oljerør oil · 20″ · onward to Ekofisk J
Landfall- Teesside United Kingdom · oil derived
- Injected into the reservoir gas curated, Sodir 20 Feb 2026
MarketThe buyers of the oil are not in the data.
The 10 largest producing fields by calculated share. The rest are under “Show all”.
Rigs
Rigs that have drilled for ORLEN in the last three yearsSodir, wellbores · 23 Nov 2026; Sodir, mobile facilities · 23 Nov 2026
| Rig | Responsible company (Sodir) | Latest well | Fields | Spudded | Wellbores, 3 yrs |
|---|---|---|---|---|---|
| Deepsea Yantai | Odfjell Drilling | 6305/10-1 | exploration | 22 Nov 2024 | 1 |
Pipeline systems and plants
Pipeline systems and plants (TUF) where ORLEN holds a stake or is the operator at Sodir. Ownership applies to the whole system, not to single pipelines.
Pipeline systems and plantsSodir, pipeline systems and plants · 23 Nov 2026
| Name | Type | Operator | Share |
|---|---|---|---|
| Gina Krog Gasseksport | Pipeline | Equinor | 41.30% |
| Gina Krog Gassimport | Pipeline | Equinor | 41.30% |
| Marulk Gassrør | Pipeline | Vår Energi | 30.00% |
| Sleipner Kondensatrør | Pipeline | Equinor | 25.00% |
| Alve Rørledning | Pipeline | Equinor | 15.00% |
| Yggdrasil Oljerør | Pipeline | Equinor | 7.34% |
| Yggdrasil Kraftanlegg | Onshore plant | Aker BP | 7.16% |
| Kvitebjørn Oljerør | Pipeline | Equinor | 6.45% |
| Yggdrasil Gassrør | Pipeline | Equinor | 5.16% |
| Valemon Gassrør | Pipeline | Gassco | 3.23% |
Show all 11Show fewer
Pipeline systems and plantsSodir, pipeline systems and plants · 23 Nov 2026
| Name | Type | Operator | Share |
|---|---|---|---|
| Valemon Kondensatrør | Pipeline | Equinor | 3.23% |
Fleet
Rigs drilling, offshore vessels at the facilities in the AIS picture 26 Nov 2026, 23:32 UTC and the supply vessels from the base in the last 30 days.
Rigs
Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 27 Nov 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 27 Nov 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 26 Nov 2026, 23:32 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Deepsea Nordkapp Odfjell Drilling
Probably drilling 25/2-H-4 H on Hugin, spudded 4 Nov 2026 (Sodir has no completion date) · operator Aker BP
AIS 26 Nov 2026, 23:32 UTC: at Øst Frigg (40 m) - Scarabeo 8 Saipem
Probably drilling 25/2-S-4 CH on Hugin Satellitter, spudded 29 Oct 2026 (Sodir has no completion date) · operator Aker BP
AIS 26 Nov 2026, 23:32 UTC: at Fulla (40 m) · 25 km from the well - West Elara Seadrill
No well in the last 120 days at Sodir
AIS 26 Nov 2026, 23:30 UTC: at Sleipner B (130 m)
Offshore vessels at the facilities
Within 2 km of a facility and under 1 knot. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 26 Nov 2026, 23:32 UTC · Norwegian Coastal Administration, Kystdatahuset: reported voyages and register type (SafeSeaNet) (NLOD 1.0), 25 Nov 2026
- Skandi Mongstad Platform Supply Ship
At Sleipner C (Sleipner Øst), 1.1 km
AIS 26 Nov 2026, 23:32 UTC · 0.8 kn
Visits, latest day with data: 1 Oct
Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Hugin Satellitter 4 vessels
69.3 hours · 5 visits, last 1 Oct 2026
Scarabeo 8, Ns Orla, Island Valiant, Solitaire Tide - Fenris 1 vessel
24 hours · 1 visit, last 1 Oct 2026
Olympic Notos - Fulla 2 vessels
14.3 hours · 3 visits, last 1 Oct 2026
Normand Prosper, Seven Falcon - Hugin 1 vessel
10.2 hours · 1 visit, last 1 Oct 2026
Seven Falcon - Yme 1 vessel
8.9 hours · 1 visit, last 1 Oct 2026
Stril Mariner - Kvitebjørn 1 vessel
2.7 hours · 1 visit, last 1 Oct 2026
Havila Charisma - Sleipner Øst 1 vessel
1.1 hours · 1 visit, last 1 Oct 2026
Esvagt Bergen - Skarv 1 vessel
0.8 hours · 1 visit, last 1 Oct 2026
Edda Flora
Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.
Supply vessels from the base, last 30 days
Reported departures by offshore vessels (register type in SafeSeaNet). Supply base: Norwegian Offshore Directorate (the field's main supply base); the port's position from the World Port Index, Wikidata or OpenStreetMap (NLOD 2.0 / offentlig eiendom / ODbL), 28 Sep 2026 · Norwegian Coastal Administration, Kystdatahuset: reported voyages and register type (SafeSeaNet) (NLOD 1.0), 25 Nov 2026
- Dusavik 16 offshore vessels, 75 departures
Most departures: Juanita 11, Edda Fram 10, Rem Crusader 10, Skandi Flora 10, Island Crusader 7 - Tananger 30 offshore vessels, 164 departures
Most departures: Arctic Tide 22, Sun Tide 13, Olympic Energy 12, Stril Pioner 11, Ns Frayja 9 - Mongstad 24 offshore vessels, 111 departures
Most departures: Havila Foresight 13, Torsborg 13, Rem Star 12, North Barents 11, Troms Arcturus 11 - Florø 18 offshore vessels, 80 departures
Most departures: Stril Neptun 15, Havila Charisma 12, Searcher Tide 12, Edda Ferd 10, Viking Princess 7 - Kristiansund 16 offshore vessels, 63 departures
Most departures: Rem Art 12, Stril Mar 11, Kongsborg 8, Sjoborg 8, Troms Sirius 7 - Sandnessjøen 4 offshore vessels, 15 departures
Most departures: Troms Pollux 5, Viking Lady 5, Troms Castor 4, Stril Poseidon 1
Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. Supply vessels per base are based on reported departures (SafeSeaNet). The destination is usually just the sea area (“Offshoreinst. Nordsjøen”, “… Barentshavet”), so the field the vessel supplies is not stated. Peterhead is British and has no departures in Kystdatahuset. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.
Export routes for the fields
Pipeline systems and plants (TUF) on the way from the fields of ORLEN that ORLEN neither owns nor operates. Those the company owns or operates are in the table above. Each field is listed with its strongest link. “With own pipelines” means that the field's pipelines belong to the system at Sodir, “onward” that the production continues into it and “possible route” that there is an onward pipeline connection, not measured flow.
Sodir, pipeline systems and plants · 23 Nov 2026; Sodir, pipelines · 23 Nov 2026; Sodir, facilities · 23 Nov 2026
Gassled Joint venture · operator Gassco
Owners: Petoro (SDFI) 100.00%
26 fields: 3 with own pipelines, 19 onward, 4 possible route
With own pipelines: Heimdal, Kvitebjørn, Sleipner Øst
Onward: Albuskjell, Alve, Alve Nord, Eirin, Fenris, Gina Krog, Gungne, Idun Nord, Marulk, Morvin, Skarv, Sleipner Vest, Tommeliten A, Tommeliten Gamma, Utgard, Valemon, Vest Ekofisk, Ærfugl Nord, Ørn
Possible route: Fulla, Hugin, Hugin Satellitter, Ormen Lange
The links: 12 from Sodir's pipeline table · 8 derived from the OESA pipeline graph · 6 curated from the field description of Norne, Åsgard, Hugin
Zeepipe I Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
9 fields: 1 with own pipelines, 3 onward, 5 possible route
With own pipelines: Sleipner Øst
Onward: Gungne, Sleipner Vest, Utgard
Possible route: Eirin, Gina Krog, Kvitebjørn, Ormen Lange, Valemon
The links: 4 from Sodir's pipeline table · 5 derived from the OESA pipeline graph
Vesterled Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
1 field: 1 with own pipelines
With own pipelines: Frigg
The links: 1 from Sodir's pipeline table
Langeled Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
9 fields: 4 onward, 5 possible route
Onward: Gungne, Sleipner Vest, Sleipner Øst, Utgard
Possible route: Eirin, Gina Krog, Kvitebjørn, Ormen Lange, Valemon
The links: 4 from Sodir's pipeline table · 5 derived from the OESA pipeline graph
Zeepipe Terminal Terminal · operator Gassco
Owners: not allocated 51.00%, Petoro (SDFI) 49.00%
9 fields: 4 onward, 5 possible route
Onward: Gungne, Sleipner Vest, Sleipner Øst, Utgard
Possible route: Eirin, Gina Krog, Kvitebjørn, Ormen Lange, Valemon
The links: 9 derived from the OESA pipeline graph
Norpipe Olje-Anlegg not in Sodir's TUF tables · operator ConocoPhillips (U.K.) Limited. for the plant
Sodir does not list owners or an operator for Norpipe Olje-anlegg; the name is not in Sodir's tables of owners and operators of pipeline systems and plants, checked at Sodir on 7 Oct 2026. The link comes from Sodir's facility table, where the plant Teesside belongs to Norpipe Olje-anlegg. Operator of the plant at Sodir: ConocoPhillips (U.K.) Limited. Sodir, DataService look-up · 7 Oct 2026
6 fields: 6 onward
Onward: Albuskjell, Fenris, Tambar Øst, Tommeliten A, Tommeliten Gamma, Vest Ekofisk
The links: 6 derived from the OESA pipeline graph
Norpipe Oljeledning Pipeline · operator ConocoPhillips
Owners: Norpipe Oil 100.00%
6 fields: 6 onward
Onward: Albuskjell, Fenris, Tambar Øst, Tommeliten A, Tommeliten Gamma, Vest Ekofisk
The links: 5 from Sodir's pipeline table · 1 derived from the OESA pipeline graph
Alvheim Rikgassrør Pipeline · gas · in service · not part of a pipeline system (TUF) at Sodir
3 fields: 3 onward
Onward: Skogul, Tyrving, Vilje
The links: 3 from Sodir's pipeline table
Mongstad Terminal Terminal · operator Equinor
Sodir lists Equinor Energy AS as operator from 16 May 2018, but no owners for Mongstad Terminal. Checked at Sodir on 7 Oct 2026. Sodir, DataService look-up · 7 Oct 2026
3 fields: 3 onward
Onward: Duva, Kvitebjørn, Valemon
The links: 3 derived from the OESA pipeline graph
Troll Oljerør II Pipeline · operator Equinor
Owners: Petoro (SDFI) 55.77%, Equinor 30.58%, Shell 8.29%, TotalEnergies 3.71%, ConocoPhillips 1.66%
3 fields: 3 onward
Onward: Duva, Kvitebjørn, Valemon
The links: 3 derived from the OESA pipeline graph
Norne Gasstransport Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
Gjøa Gassrør Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
1 field: 1 onward
Onward: Duva
The links: 1 from Sodir's pipeline table
Gjøa Oljerør Pipeline · oil · in service · not part of a pipeline system (TUF) at Sodir
1 field: 1 onward
Onward: Duva
The links: 1 from Sodir's pipeline table
Nyhamna Landanlegg Onshore plant · operator Gassco
Owners: Petoro (SDFI) 81.30%, North Sea Infrastructure 13.70%, Equinor 5.00%
1 field: 1 onward
Onward: Ormen Lange
The links: 1 from Sodir's pipeline table
Ula Oljerør Pipeline · operator Aker BP
Owners: Aker BP 100.00%
1 field: 1 onward
Onward: Tambar Øst
The links: 1 from Sodir's pipeline table
Åsgard Transport Pipeline · operator Gassco
Owners: Petoro (SDFI) 100.00%
Nybro Tee – Niechorze-Pogorzelica, Polen Pipeline · gas · in service · not part of a pipeline system (TUF) at Sodir
Grane Oljerør Pipeline · operator Equinor
Owners: Petoro (SDFI) 42.06%, Vår Energi 28.22%, Equinor 23.54%, ConocoPhillips 6.17%
3 fields: 3 possible route
Possible route: Fulla, Hugin, Hugin Satellitter
The links: 3 curated from the field description of Hugin
Oseberg Transportsystem Pipeline · operator Equinor
Owners: Petoro (SDFI) 48.38%, Equinor 36.23%, TotalEnergies 12.98%, ConocoPhillips 2.40%
3 fields: 3 possible route
Possible route: Fulla, Hugin, Hugin Satellitter
The links: 3 curated from the field description of Hugin
Supply bases
The main supply base the Norwegian Offshore Directorate lists for each field. Sodir, supply base · 28 Sep 2026
- Dusavik 6 fieldsGina Krog, Sleipner Vest, Eirin, Gungne, Sleipner Øst, Heimdal
- Sandnessjøen 4 fieldsSkarv, Alve, Marulk, Ærfugl Nord
- Mongstad 3 fieldsKvitebjørn, Valemon, Huldra
- Tananger 2 fieldsTommeliten A, Fenris
- Kristiansund 2 fieldsOrmen Lange, Morvin
- Florø 1 fieldsDuva
Connected to
Partners
The companies ORLEN shares the most fields with, by current stakes. Sodir, licensees · 23 Nov 2026
- Equinor 25 shared fields
- Aker BP 20 shared fields
- Vår Energi 10 shared fields
- Petoro (SDFI) 9 shared fields
- DNO 7 shared fields
- ConocoPhillips 5 shared fields
- Harbour Energy 4 shared fields
- TotalEnergies 3 shared fields
- Repsol 2 shared fields
- NEO NEXT+ Energy 1 shared fields
- Ithaca EF 1 shared fields
- Shell 1 shared fields
Responsible for the rigs that have drilled for the company
The company Sodir lists as responsible for each rig, not necessarily the owner. Sodir, mobile facilities · 23 Nov 2026
Projects
- Utsira High power from shore part of
Pipeline systems and plants
- Gassco operator
Events
Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.
- Production
Production started on Ørn
Owners: ORLEN 40%, Aker BP 30% and Equinor 30%
- Production
Production started on Alve Nord
Owners: Aker BP 58.083%, Harbour Energy 20%, ORLEN 11.918% and JAPEX 10%
- Production
Production started on Idun Nord
Owners: Equinor 36.165%, Harbour Energy 28.083%, Aker BP 23.835% and ORLEN 11.918%
- Ownership
Interests in 2 production licences transferred from Vår Energi and Equinor to ORLEN and DNO
- Production
- Production
Hugin Satellitter was given the status «approved for production» by Sodir
Owners: Aker BP 87.7% and ORLEN 12.3%
- Ownership
ORLEN acquired interests in 2 production licences from DNO
Fields: Albuskjell and Vest Ekofisk
At Sodir: PL 018 B (7.604%), PL 018 F (7.604%)
- Ownership
DNO acquired interests in 2 production licences from ORLEN
At Sodir: PL 127 DS (11.918%), PL 1135 (20%)
- Ownership
ORLEN acquired interests in 2 production licences from TotalEnergies
At Sodir: PL 044 (15%), PL 044 D (15%)
Last 12 months (27 Nov 2025–27 Nov 2026). Ownership: name changes and moves within a group are left out. The field is named only when the licence owns the field directly at Sodir. Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 27 Nov 2026), exploration wells and discoveries (27 Nov 2026), wellbores with drilling rig and the company responsible for the rig (23 Nov 2026) and field status (23 Nov 2026).
Economics
Estimated gross sales value of ORLEN's share of production, month by month. The share is the equity share in force each month.
- Last 12 months
- 31.0 NOK bnestimateOct 2025–Sep 2026
- September 2026
- 3.1 NOK bnestimateBrent USD 114.16/bbl · gas EUR 75.3/MWh
- Share of the shelf's value
- 2.41%estimatelast 12 months
- Gas in the value
- 78%estimatelast 12 months
Oil and condensateGasNGL
Show as table
| Month | Oil and condensate | Gas | NGL | Total (NOK bn) |
|---|---|---|---|---|
| Sep 2026 | 0.48 | 2.6 | 0.04 | 3.1 |
| Aug 2026 | 0.53 | 2.6 | 0.05 | 3.1 |
| Jul 2026 | 0.55 | 2.4 | 0.05 | 3.0 |
| Jun 2026 | 0.50 | 2.0 | 0.06 | 2.6 |
| May 2026 | 0.70 | 2.3 | 0.09 | 3.1 |
| Apr 2026 | 0.68 | 2.1 | 0.07 | 2.8 |
| Mar 2026 | 0.58 | 2.4 | 0.05 | 3.0 |
| Feb 2026 | 0.39 | 1.4 | 0.05 | 1.8 |
| Jan 2026 | 0.43 | 1.8 | 0.06 | 2.3 |
| Dec 2025 | 0.41 | 1.5 | 0.06 | 2.0 |
| Nov 2025 | 0.42 | 1.6 | 0.05 | 2.1 |
| Oct 2025 | 0.46 | 1.6 | 0.06 | 2.1 |
| Sep 2025 | 0.42 | 1.3 | 0.04 | 1.7 |
| Aug 2025 | 0.50 | 1.6 | 0.05 | 2.1 |
| Jul 2025 | 0.55 | 1.8 | 0.05 | 2.4 |
| Jun 2025 | 0.35 | 1.3 | 0.04 | 1.7 |
| May 2025 | 0.50 | 1.4 | 0.05 | 1.9 |
| Apr 2025 | 0.57 | 1.7 | 0.06 | 2.3 |
| Mar 2025 | 0.64 | 2.0 | 0.07 | 2.7 |
| Feb 2025 | 0.63 | 2.2 | 0.07 | 2.9 |
| Jan 2025 | 0.78 | 2.5 | 0.08 | 3.3 |
| Dec 2024 | 0.70 | 2.3 | 0.08 | 3.1 |
| Nov 2024 | 0.70 | 2.2 | 0.09 | 3.0 |
| Oct 2024 | 0.73 | 2.1 | 0.07 | 2.9 |
The fields, last 12 monthsestimate
| Field | Share | Value |
|---|---|---|
| Tommeliten A | 42.20% | 6.4 NOK bn |
| Ormen Lange | 14.02% | 6.1 NOK bn |
| Gina Krog | 41.30% | 4.7 NOK bn |
| Skarv | 11.92% | 4.2 NOK bn |
| Duva | 30.00% | 2.2 NOK bn |
| Sleipner Vest | 24.41% | 1.6 NOK bn |
| Eirin | 41.30% | 1.0 NOK bn |
| Alve | 15.00% | 988 NOK m |
| Kvitebjørn | 6.45% | 837 NOK m |
| Yme | 20.00% | 627 NOK m |
| Tyrving | 11.95% | 596 NOK m |
| Ørn | 40.00% | 322 NOK m |
| Marulk | 30.00% | 269 NOK m |
| Skogul | 35.00% | 198 NOK m |
| Utgard | 23.56% | 188 NOK m |
Share: the equity share today. Value: estimated sales value of the share over the last 12 months, with the share in force each month. Showing the 15 largest of 24 fields with production.
Check against Statistics Norway
For the whole shelf the method gives NOK 1,285.4 bn for Oct 2025–Sep 2026. Statistics Norway's export value for crude oil, condensate, pipeline gas, LNG, propane and butane was NOK 1,217.1 bn, −5.3% against the estimate. Month by month the difference ranged from −10.5% (June 2026) to +0.9% (September 2026); Statistics Norway was below the estimate in 11 of 12 months. Crude oil and condensate in the trade statistics (commodity numbers 2709.0009 and 2709.0001) were 94% of oil and condensate production, and pipeline gas (2711.2100) was 94% of gas production in the same months. On top of this, 4.96 million tonnes of LNG (2711.1100) were exported. Statistics Norway reports LNG only in tonnes, so it is not included in the gas percentage. The prices in Statistics Norway's export statistics differed on average by −0.7% from Brent and −0.8% from the gas price, but by up to −10.7% for oil in a single month (June 2026). Exports of propane and butane averaged 62% of NGL production converted to tonnes, so the NGL price only covers part of the products.
How the estimate is calculated
Estimated gross sales value, calculated by OESA: for each field and month, (oil + condensate) × 6.2898 bbl/Sm³ × Brent (USD/bbl) × USD/NOK, gas × 0.011111 MWh/Sm³ (40 MJ) × European gas price (EUR/MWh) × EUR/NOK and NGL ÷ 1.9 Sm³ o.e. per tonne × NGL price (NOK/tonne) are added up. A company's figure is the field value times the equity share in force on the 15th of each month, summed over the fields and the group's legal entities. These are not the companies' own figures. Prices in September 2026: Brent USD 114.16/bbl, gas in Europe USD 25.42/mmbtu (EUR 75.34/MWh), NGL NOK 5,127/tonne, USD/NOK 9.3817 and EUR/NOK 10.8003. Sources of error: Brent and TTF are benchmark prices. Actual sales prices depend on crude quality, timing of sales, contracts and hub (NBP, THE, PEG, ZTP). The production month is not the sales month: cargoes are lifted and sold at other times (over/underlift, storage). The energy content of gas is set to 40 MJ/Sm³ for all fields, and NGL to 1.9 Sm³ o.e. per tonne. Both vary between fields. NGL is priced with Statistics Norway's export price for propane and butane; ethane and other NGL products may have other prices. Transport tariffs (Gassled), tax (78%), costs and hedging are not deducted. The figure is market sales value, not netback at the field or profit. LNG from Melkøya is priced as pipeline gas.
Accounts
Key figures from the annual accounts in the Brønnøysund register for the Norwegian companies behind it, in the currency the company reports in. The figures cover the whole company, not just the Norwegian shelf.
ORLEN Upstream Norway AScompany · org. no. 991 317 155
| Year (NOK) | Revenue | Operating profit | Net profit |
|---|---|---|---|
| 2025 | 28.5 bn | 12.5 bn | 2.5 bn |
| 2024 | 31.3 bn | 15.2 bn | 3.8 bn |
| 2023 | 22.1 bn | 11.8 bn | 3.1 bn |
Sources: Norwegian Offshore Directorate, marketable production per field and month, NLOD 2.0, 23 Nov 2026. Norwegian Offshore Directorate, licensees per field with history, NLOD 2.0, 23 Nov 2026. U.S. Energy Information Administration, Europe Brent Spot Price FOB (RBRTE), via FRED (DCOILBRENTEU), Public Domain: Citation Requested (FRED), 23 Nov 2026. EIA lists «Refinitiv, an LSEG business» as the source of the spot prices. World Bank, Commodity Price Data (The Pink Sheet), monthly prices, «Natural gas, Europe», CC BY 4.0, 3 Nov 2026. From April 2015 the series is TTF (Netherlands), according to the World Bank's description in the file. Norges Bank, exchange rates (EXR), monthly average, NLOD 2.0, 23 Nov 2026. The licence is stated on the dataset «API for åpne data» at data.norge.no. Norges Bank's own open-data page states no licence. Statistics Norway, table 08799: External trade in goods by commodity number, imports/exports, country and month (exports, all countries), CC BY 4.0, 16 Nov 2026. Value ÷ quantity for exported propane (2711.1200) and butane (2711.1300). Statistics Norway notes that 0 may also mean the figure is confidential. Brønnøysund Register Centre, Register of Company Accounts (key figures), NLOD 2.0, 23 Nov 2026. The API is described as a temporary R&D API. The organisation numbers come from the Norwegian Offshore Directorate's company table. Norwegian Offshore Directorate, companies with organisation numbers, NLOD 2.0, 23 Nov 2026. The estimates are calculated by OESA and are not the companies' own figures.
Notes
- The shares are legal ownership shares in the fields (Sodir), not the company's reported production.
- Gas is mixed in the pipeline network. A «possible route» is a pipeline connection onwards from a junction or an onshore plant, not a measure of where the field's gas actually goes.
- The arrows show direction, not volume. The direction is Sodir's from → to for each pipeline; Sodir has no flow per pipeline.
Sources
All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.
- ENTSOG Transparency Platform, entry points for Norwegian gas (the points in OESA's gas panel); position from the Norwegian Offshore Directorate 23 Nov 2026
- Supply base: Norwegian Offshore Directorate (field table); the position is the port's, from the World Port Index, Wikidata or OpenStreetMap 28 Sep 2026 · licence NLOD 2.0 / public domain / ODbL
- OESA, pipeline graph derived from Sodir pipelines and facilities (merging ≤0.8 km, tee ≤4 km, branch ≤1 km) 23 Nov 2026Pipelines are linked on the Sodir facility ids. Pipeline ends without a continuation are linked into the nearest pipeline with the same medium within 4 km.
- Norwegian Offshore Directorate, wellbores with drilling facility (spudded in the last three years) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, licensees per field (current shares) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, fields: status, operator and supply base 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, mobile facilities (responsible company and Acknowledgement of Compliance) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, facilities 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, marketable production per field and month 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, transport pipelines 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, owners and operators of pipeline systems and plants (TUF) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, owners and operators of pipeline systems and plants (look-up on 7 Oct 2026) 7 Oct 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Ormen Lange (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Alvheim (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Hugin (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Åsgard (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Norne (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Ula (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Yme (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Skarv (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Volund (SAGE to St Fergus), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Gjøa (FLAGS to St Fergus), curated by OESA 20 Feb 2026 · licence NLOD 2.0
Not in the data: Flow in each pipeline, which field's gas ends up in which country, the buyers of oil and gas and the company's contracts.