Project · power from shore
Utsira High power from shore
Power from shore to Johan Sverdrup and on to the fields on the Utsira High. Sodir lists the power solution as two TUFs, Johan Sverdrup kraftanlegg and Utsira High Power Hub, with the same owners as Johan Sverdrup.
- Fields Sodir states receive power from shore via the solution
- 6
- Sodir, field descriptions · 7 Oct 2026
The chain
From owner to where the CO₂, gas or power ends up. Links without their own label have their source in the column heading.
- Equinor42.63%
- Aker BP31.57%
- Petoro (SDFI)17.36%
- TotalEnergies8.44%
- Power plantsFields receiving powerOnward via a field
- Gina Krog via Johan Sverdrup curated, Sodir 7 Oct 2026
- Sleipner Øst via Gina Krog partly curated, Sodir 7 Oct 2026
From the sources
- Johan Sverdrup:
Johan Sverdrup receives power from shore through the area solution for the Utsira High, and is therefore producing with very low CO2 emissions.
curated, Sodir 7 Oct 2026 - Edvard Grieg:
Since 2022, Edvard Grieg receives power from shore through the area solution for the Utsira High, and is therefore producing with very low CO2 emissions.
curated, Sodir 7 Oct 2026 - Ivar Aasen:
Since 2023, the Ivar Aasen platform receives power from shore through the area solution for the Utsira High.
curated, Sodir 7 Oct 2026 - Gudrun:
Gudrun has been supplied with power from shore through the area solution for the Utsira High since 2024.
curated, Sodir 7 Oct 2026 - Gina Krog:
Since 2023, Gina Krog is fully electrified by power from shore via the Johan Sverdrup field.
curated, Sodir 7 Oct 2026 - Sleipner Øst:
Sleipner has been partly supplied with power from shore via the Gina Krog platform since 2024.
curated, Sodir 7 Oct 2026
Pipeline systems and plants
Pipeline systems and plants (TUF) in the project, with the owners.
Pipeline systems and plantsSodir, pipeline systems and plants · 7 Oct 2026
| Name | Type | Operator | Owners |
|---|---|---|---|
| Johan Sverdrup Kraftanlegg | Onshore plant | Equinor | Equinor 42.63%, Aker BP 31.57%, Petoro (SDFI) 17.36%, TotalEnergies 8.44% |
| Utsira High Power Hub | Pipeline | Equinor | Equinor 42.63%, Aker BP 31.57%, Petoro (SDFI) 17.36%, TotalEnergies 8.44% |
Fleet
Rigs drilling, offshore vessels at the facilities in the AIS picture 7 Oct 2026, 14:34 UTC and the supply vessels from the base in the last 30 days.
Rigs
Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 7 Oct 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 7 Oct 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 7 Oct 2026, 14:34 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Noble Invincible Noble
Probably drilling 16/1-D-12 AY1 on Ivar Aasen, spudded 13 Sep 2026 (Sodir has no completion date) · operator Aker BP
AIS 7 Oct 2026, 14:33 UTC: at Ivar Aasen (100 m) - Shelf Drilling Barsk Shelf Drilling (Norway) AS
Probably drilling 15/3-A-3 on Gudrun, spudded 22 Jul 2026 (Sodir has no completion date) · operator Equinor
AIS 7 Oct 2026, 14:34 UTC: at Gudrun (100 m) - Island Wellserver Island Offshore III AS
No well in the last 120 days at Sodir
AIS 7 Oct 2026, 14:34 UTC: at Johan Sverdrup E (20 m)
Offshore vessels at the facilities
Within 2 km of a facility and under 1 knot. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 7 Oct 2026, 14:34 UTC · Norwegian Coastal Administration, Kystdatahuset: reported voyages and register type (SafeSeaNet) (NLOD 1.0), 6 Oct 2026
- Sygna Tide Platform Supply Ship
At Gudrun, 150 m
AIS 7 Oct 2026, 14:34 UTC · 0.2 kn
Visits, latest day with data: 1 Oct
Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Island Crusader Platform Supply Ship
13.5 hours · 2 visits, last 1 Oct 2026
At Johan Sverdrup E, Johan Sverdrup P1 - Olympic Energy Platform Supply Ship
11.6 hours · 2 visits, last 1 Oct 2026
At Ivar Aasen - Island Wellserver rig, vessel · Island Offshore III AS
4.9 hours · 1 visit, last 1 Oct 2026
At Johan Sverdrup P - North Barents Platform Supply Ship
3.7 hours · 3 visits, last 1 Oct 2026
At Johan Sverdrup K - Edda Fram Platform Supply Ship
2.7 hours · 1 visit, last 1 Oct 2026
At Gudrun - Esvagt Bergen Offshore Support Vessel
1.1 hours · 1 visit, last 1 Oct 2026
At Sleipner C - Sun Tide Platform Supply Ship
0.7 hours · 1 visit, last 1 Oct 2026
At Edvard Grieg
Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.
Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.
Events
Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.
- Rig
Noble Invincible spudded well 16/1-D-12 AY1 on Ivar Aasen for Aker BPderived
Development well · came from Valhall, last well 2/8-C-2 · responsible company (Sodir): Noble
- Rig
Shelf Drilling Barsk spudded well 15/3-A-3 on Gudrun for Equinorderived
Development well · came from Sleipner Vest, last well 15/9-B-23 · responsible company (Sodir): Shelf Drilling (Norway)
- Rig
COSLInnovator spudded well 16/2-24 on Johan Sverdrup for Equinorderived
Development well · came from PL 090 HS, last well 35/11-32 S · 2 wellbores there so far · responsible company (Sodir): COSL
- Rig
Deepsea Bergen (then Deepsea Bollsta) spudded well 16/2-H-4 H on Johan Sverdrup for Equinorderived
Development well · came from Visund Sør, last well 34/8-V-1 BH · 4 wellbores there so far · responsible company (Sodir): Odfjell Drilling
Last 12 months (7 Oct 2025–7 Oct 2026). Rigs: derived by OESA from Sodir's wellbores. An event when a moveable rig spuds a development or exploration well for another operator, or more than 3 km from its previous wellbore in another field or licence. Moves between templates on the same field are not included. «Came from» is the rig's previous wellbore at Sodir. The responsible company is the one Sodir lists as responsible for the rig today, not necessarily the owner. Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 7 Oct 2026), exploration wells and discoveries (7 Oct 2026), wellbores with drilling rig and the company responsible for the rig (7 Oct 2026) and field status (7 Oct 2026).
Notes
- Cable routes, voltage and capacity are not in the Sodir data, so the cables are not drawn.
- The landfall HAUGSNESET has no position at Sodir.
Sources
All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.
- Norwegian Offshore Directorate, field descriptions 7 Oct 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, owners and operators of pipeline systems and plants (TUF) 7 Oct 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Johan Sverdrup 7 Oct 2026 · licence NLOD 2.0 · curated by OESA
- Norwegian Offshore Directorate, field description Edvard Grieg 7 Oct 2026 · licence NLOD 2.0 · curated by OESA
- Norwegian Offshore Directorate, field description Ivar Aasen 7 Oct 2026 · licence NLOD 2.0 · curated by OESA
- Norwegian Offshore Directorate, field description Gudrun 7 Oct 2026 · licence NLOD 2.0 · curated by OESA
- Norwegian Offshore Directorate, field description Gina Krog 7 Oct 2026 · licence NLOD 2.0 · curated by OESA
- Norwegian Offshore Directorate, field description Sleipner Øst 7 Oct 2026 · licence NLOD 2.0 · curated by OESA