Field · the network on the Norwegian shelf
Øst Frigg
Øst Frigg is a gas field in the North Sea, operated by Aker BP ASA. The map shows the owners.
Show on the globeField pageFact page at the Norwegian Offshore Directorate
The network
From owner to market. Links without their own label have their source in the column heading; curated, derived and possible links are labelled at the link.
- The colour shows the content:
- Gas
- Oil
- Condensate
- CO₂
- Oil and condensate
- The line shows the source:
- pipeline in Sodir data
- curated from Sodir's field description
- possible onward route, not measured flow
- planned or not in service
The links show direction, not volume.
- Aker BP operator47.70%Aker BP ASA · unchanged since 31 Dec 2021
- Equinor40.00%Equinor Energy AS · unchanged since 10 Feb 2017
- ORLEN12.30%ORLEN Upstream Norway AS · unchanged since 2 May 2023
- The fieldØst FriggShut down · GasFacilities and pipelines
No facilities in service at Sodir
LandfallNot in the data.
MarketNot in the data.
Notes
- The export route is not in the data.
- The field is shut down. The pipelines are shown with the phase Sodir gives.
Fleet
Rigs drilling, offshore vessels at the facilities in the AIS picture 26 Nov 2026, 23:32 UTC and the supply vessels from the base in the last 30 days.
Rigs
Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 27 Nov 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 27 Nov 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 26 Nov 2026, 23:32 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Deepsea Nordkapp Odfjell Drilling
Probably drilling 25/2-H-4 H on Hugin, spudded 4 Nov 2026 (Sodir has no completion date) · operator Aker BP
AIS 26 Nov 2026, 23:32 UTC: at Øst Frigg (40 m)
Visits, latest day with data: 1 Oct
Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
No rigs or offshore vessels lay at the facilities in the period.
Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.
Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.
Events
Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.
No events in the last 12 months in the data.
Last 12 months (27 Nov 2025–27 Nov 2026). Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 27 Nov 2026), exploration wells and discoveries (27 Nov 2026), wellbores with drilling rig and the company responsible for the rig (23 Nov 2026) and field status (23 Nov 2026).
Sources
All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.
- Norwegian Offshore Directorate, licensees per field (current shares) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, fields: status, operator and supply base 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, facilities 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, marketable production per field and month 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, reserves per field 23 Nov 2026 · licence NLOD 2.0
Not in the data: Flow in each pipeline, which field's gas ends up in which country, and the buyers of oil and gas. Gas is mixed in the network, so a “possible route” is a pipeline connection, not measured flow.