Gassco operates 29 pipeline systems and plants at the Norwegian Offshore Directorate, with 38 transport pipelines. The map shows each system with its owners, pipelines, end points and the entry points in Europe. Vestprosess has no owners or operator at Sodir. Gassco is Sodir's operator for the pipelines that belong to it.

Show on the globe

Pipeline systems and plants where the company has a stake or operates the system or parts of it
30
Sodir, pipeline systems and plants · 7 Oct 2026
Transport pipelines in service operated by the company
33
Sodir, pipelines · 7 Oct 2026

The network

From the operator to each pipeline system or plant, its pipelines, end points and the entry points in Europe.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in Sodir data
  • curated from Sodir's field description
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Gasscooperator of 29 systems and plants · 38 pipelines
Pipeline system or plantSodir, pipeline systems and plants · 7 Oct 2026
PipelinesSodir, pipelines · 7 Oct 2026
End pointsSodir, facilities · 7 Oct 2026
Entry to EuropeENTSOG points in the gas panel · 7 Oct 2026
  1. Pipeline system or plantGassledJoint venture · activePetoro (SDFI) 100.00%
    Pipelines
    • Visund – Visund T gas · 20″
    • Åsgard Transport gas · 42″
    • Europipe I gas · 40″ · 2 sections
    • Europipe II gas · 42″
    • Franpipe gas · 42″
    • Kvitebjørn Gassrør gas · 30″
    • Langeled gas · 42″ · 2 sections
    • Norne Gasstransport gas · 16″
    • Norpipe Gassledning gas · 36″ · 4 sections
    • Oseberg Gasstransport gas · 36″
    • Statpipe gas · 30″ · 5 sections
    • Tampen Link gas · 32″
    • Vesterled gas · 32″
    • Zeepipe I gas · 40″ · 2 sections
    • Zeepipe II A gas · 40″
    • Zeepipe II B gas · 40″
    End points
    • Kårstø Norway
    • Emden Germany
    • Dunkerque France
    • Kollsnes Norway
    • Nyhamna Norway
    • Easington United Kingdom
    • Zeebrugge Belgium
    Entry to Europe
    • Emden Germany
    • Dornum Germany
    • St Fergus United Kingdom
    • Easington United Kingdom
    • Zeebrugge (ZPT) Belgium
    • Dunkerque France
  2. Pipeline system or plantValemon GassrørPipeline · activeEquinor 66.78%, Petoro (SDFI) 30.00%, ORLEN 3.23%
    Pipelines
    • Huldra Gassrør gas · 22″ · decommissioned
    • Valemon Gassrør gas · 22″ · decommissioned
    End points

    –

    Entry to Europe

    –

  3. Pipeline system or plantVestprosessnot in Sodir's TUF tables · operator Gassco for the pipelines
    Pipelines
    • Vestprosess condensate · 12.75″ · 2 sections
    End points
    • Kollsnes Norway
    Entry to Europe

    –

  4. Pipeline system or plantGjøa GassrørPipeline · activePetoro (SDFI) 100.00%
    Pipelines
    • Gjøa Gassrør gas · 28″
    End points

    –

    Entry to Europe

    –

  5. Pipeline system or plantHaltenpipePipeline · activePetoro (SDFI) 57.81%, Equinor 19.06%, ConocoPhillips 18.13%, Vår Energi 5.00%
    Pipelines
    • Haltenpipe gas · 16″
    End points

    –

    Entry to Europe

    –

  6. Pipeline system or plantKnarr GassrørPipeline · activeShell 45.00%, Harbour Energy 30.00%, INPEX Idemitsu 25.00%
    Pipelines
    • Knarr Gassrør gas · 12″ · decommissioned
    End points

    –

    Entry to Europe

    –

  7. Pipeline system or plantPolarledPipeline · activePetoro (SDFI) 90.00%, Equinor 5.00%, M Vest Energy 5.00%
    Pipelines
    • Polarled gas · 36″
    End points
    • Nyhamna Norway
    Entry to Europe

    –

  8. Pipeline system or plantStatpipePipeline · activePetoro (SDFI) 100.00%
    Pipelines
    • Statpipe gas · 36″ · decommissioned
    End points

    –

    Entry to Europe

    –

  9. Pipeline system or plantUtsirahøyden GassrørPipeline · activeAker BP 47.70%, Equinor 24.88%, Harbour Energy 9.88%, OMV 8.33% (+2)
    Pipelines
    • Utsirahøyden Gassrør gas · 16″
    End points

    –

    Entry to Europe

    –

  10. Pipeline system or plantVesterledPipeline · activePetoro (SDFI) 100.00%
    Pipelines
    • Vesterled T gas · 32″ · decommissioned
    End points

    –

    Entry to Europe

    –

Show all 30Show fewer
  1. Pipeline system or plantZeepipe IPipeline · activePetoro (SDFI) 100.00%
    Pipelines
    • Zeepipe I gas · 30″
    End points

    –

    Entry to Europe

    –

  2. Pipeline system or plantÅsgard TransportPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Åsgard – Kårstø Terminal · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  3. Pipeline system or plantDunkerque TerminalTerminal · activePetoro (SDFI) 65.00%, not allocated 35.00%
    Pipelines

    Dunkerque · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  4. Pipeline system or plantEuropipe IPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Draupner E – Emden · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  5. Pipeline system or plantEuropipe IIPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Kårstø – Dornum · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  6. Pipeline system or plantFranpipePipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Draupner E – Dunkerque · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  7. Pipeline system or plantKårstø GassanleggOnshore plant · activePetoro (SDFI) 100.00%
    Pipelines

    Kårstø · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  8. Pipeline system or plantKollsnes GassanleggTerminal · activePetoro (SDFI) 100.00%
    Pipelines

    Kollsnes · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  9. Pipeline system or plantKvitebjørn GassrørPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Kvitebjørn – via Visund T to Kollsnes · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  10. Pipeline system or plantLangeledPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Nyhamna – Easington via Sleipner Riser · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  11. Pipeline system or plantNorne GasstransportPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Norne – Åsgard Transport · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  12. Pipeline system or plantNorpipe GassledningPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Norpipe Y – Emden · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  13. Pipeline system or plantNorsea GassterminalTerminal · activePetoro (SDFI) 100.00%
    Pipelines

    Emden · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  14. Pipeline system or plantNyhamna LandanleggOnshore plant · activePetoro (SDFI) 81.30%, North Sea Infrastructure 13.70%, Equinor 5.00%
    Pipelines

    Nyhamna · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  15. Pipeline system or plantOseberg GasstransportPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Oseberg – Heimdal riser platform · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  16. Pipeline system or plantTampen LinkPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Statfjord B – Flags (BrentA) · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  17. Pipeline system or plantZeepipePipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Sleipner Øst – Zeebrugge · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  18. Pipeline system or plantZeepipe IIAPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Kollsnes – Sleipner · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  19. Pipeline system or plantZeepipe IIBPipeline · activePetoro (SDFI) 100.00%
    Pipelines

    Kollsnes – Draupner E · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

  20. Pipeline system or plantZeepipe TerminalTerminal · activenot allocated 51.00%, Petoro (SDFI) 49.00%
    Pipelines

    Zeebrugge · Sodir, pipeline systems and plants · 7 Oct 2026

    End points

    –

    Entry to Europe

    –

Connected to

Pipeline systems and plants

Economics

Accounts

Key figures from the annual accounts in the Brønnøysund register for the Norwegian companies behind it, in the currency the company reports in. The figures cover the whole company, not just the Norwegian shelf.

Gassco AScompany · org. no. 983 452 841

Year (NOK)RevenueOperating profitNet profit
2025––0
2024000
2023000

Sources: Brønnøysund Register Centre, Register of Company Accounts (key figures), NLOD 2.0, 7 Oct 2026. The API is described as a temporary R&D API. The organisation numbers come from the Norwegian Offshore Directorate's company table. Norwegian Offshore Directorate, companies with organisation numbers, NLOD 2.0, 7 Oct 2026. The estimates are calculated by OESA and are not the companies' own figures.

Notes

Sources

All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.