Field · the network on the Norwegian shelf
Fulla
Fulla is a field in the North Sea, operated by Aker BP ASA. The map shows the owners, the pipelines, where the production comes ashore and the possible onward routes.
Show on the globeField pageFact page at the Norwegian Offshore Directorate
The network
From owner to market. Links without their own label have their source in the column heading; curated, derived and possible links are labelled at the link.
- The colour shows the content:
- Gas
- Oil
- Condensate
- CO₂
- Oil and condensate
- The line shows the source:
- pipeline in Sodir data
- curated from Sodir's field description
- possible onward route, not measured flow
- planned or not in service
The links show direction, not volume.
- Aker BP operator47.70%Aker BP ASA · unchanged since 27 Jun 2023
- Equinor40.00%Equinor Energy AS · unchanged since 27 Jun 2023
- ORLEN12.30%ORLEN Upstream Norway AS · unchanged since 27 Jun 2023
- The fieldFullaApproved for productionFacilities and pipelines
No facilities in service at Sodir
Processed at Hugin curated, Sodir 20 Feb 2026
- Hugin A – Yop-Y oil · 24″ · onward to Yop-Y · under installation
- Hugin A – Statpipe HTT gas · 28″ · onward to Statpipe HTT · under installation
Landfall- Kårstø Norway · gas curated, Sodir 20 Feb 2026 planned
- Sture Norway · oil curated, Sodir 20 Feb 2026 planned
Market- Possible routes for the gas
- Dornum, Emden Germany
- Dunkerque France
- North Sea Entry Denmark
The buyers of the oil are not in the data.
Transport according to Sodir's field description
The well stream will be routed by pipeline to the Hugin field for processing and further transport.
Quoted from Sodir's field description, updated 20 Feb 2026. Sodir, field description
Notes
- The gas pipeline from Hugin A is being installed. The tie-in (Statpipe HTT) has no position at Sodir yet, so the pipeline into Kårstø is shown. curated, Sodir 20 Feb 2026
- The oil pipeline from Hugin A to the Grane oil pipeline (YOP-Y) is being installed. curated, Sodir 20 Feb 2026
- Gas is mixed in the pipeline network. A «possible route» is a pipeline connection onwards from a junction or an onshore plant, not a measure of where the field's gas actually goes.
- The arrows show direction, not volume. The direction is Sodir's from → to for each pipeline; Sodir has no flow per pipeline.
Rigs
Rigs that have drilled on Fulla in the last three yearsSodir, wellbores · 23 Nov 2026; Sodir, mobile facilities · 23 Nov 2026
| Rig | Responsible company (Sodir) | Latest well | Operator | Spudded | Wellbores, 3 yrs |
|---|---|---|---|---|---|
| Scarabeo 8 | Saipem | 30/11-F-6 H | Aker BP | 12 Sep 2026 | 3 |
| Deepsea Stavanger | Odfjell Drilling | 25/1-14 E | Aker BP | 29 Jul 2025 | 2 |
Pipeline systems and plants
Pipeline systems and plants (TUF) that the field's pipelines belong to or that the production continues into, with the owners. “Onward” means that the production continues into it. The link comes from the pipelines in the map above. Possible onward routes are in a separate table: there is an onward pipeline connection, but the flow is not measured, and the gas is mixed in the network.
Pipeline systems and plantsSodir, pipeline systems and plants · 23 Nov 2026
| Name | Type | Operator | Link | Owners |
|---|---|---|---|---|
| Yggdrasil Gassrør | Pipeline | Equinor | onward | Aker BP 54.63%, Equinor 40.21%, ORLEN 5.16% |
| Yggdrasil Oljerør | Pipeline | Equinor | onward | Aker BP 68.30%, Equinor 24.36%, ORLEN 7.34% |
Show 3 possible onward routesShow fewer
Possible onward routesSodir, pipeline systems and plants · 23 Nov 2026
| Name | Type | Operator | Owners |
|---|---|---|---|
| Gassled | Joint venture | Gassco | Petoro (SDFI) 100.00% |
| Grane Oljerør | Pipeline | Equinor | Petoro (SDFI) 42.06%, Vår Energi 28.22%, Equinor 23.54%, ConocoPhillips 6.17% |
| Oseberg Transportsystem | Pipeline | Equinor | Petoro (SDFI) 48.38%, Equinor 36.23%, TotalEnergies 12.98%, ConocoPhillips 2.40% |
Fleet
Rigs drilling, offshore vessels at the facilities in the AIS picture 26 Nov 2026, 23:32 UTC and the supply vessels from the base in the last 30 days.
Rigs
Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 27 Nov 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 27 Nov 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 26 Nov 2026, 23:32 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Scarabeo 8 Saipem
Probably drilling 25/2-S-4 CH on Hugin Satellitter, spudded 29 Oct 2026 (Sodir has no completion date) · operator Aker BP
AIS 26 Nov 2026, 23:32 UTC: at Fulla (40 m) · 25 km from the well
Visits, latest day with data: 1 Oct
Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026
- Normand Prosper Offshore Tug/Supply Ship · Solstad
12.2 hours · 2 visits, last 1 Oct 2026
At Fulla - Seven Falcon Diving Support Vessel · Subsea 7
2.1 hours · 1 visit, last 1 Oct 2026
At Fulla
Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.
Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.
Events
Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.
- Rig
Scarabeo 8 spudded well 30/11-F-3 H on Fulla for Aker BPderived
Development well · came from PL 1153, last well 36/4-2 A · 3 wellbores there so far · responsible company (Sodir): Saipem
Last 12 months (27 Nov 2025–27 Nov 2026). Rigs: derived by OESA from Sodir's wellbores. An event when a moveable rig spuds a development or exploration well for another operator, or more than 3 km from its previous wellbore in another field or licence. Moves between templates on the same field are not included. «Came from» is the rig's previous wellbore at Sodir. The responsible company is the one Sodir lists as responsible for the rig today, not necessarily the owner. Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 27 Nov 2026), exploration wells and discoveries (27 Nov 2026), wellbores with drilling rig and the company responsible for the rig (23 Nov 2026) and field status (23 Nov 2026).
Sources
All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.
- ENTSOG Transparency Platform, entry points for Norwegian gas (the points in OESA's gas panel); position from the Norwegian Offshore Directorate 23 Nov 2026
- OESA, pipeline graph derived from Sodir pipelines and facilities (merging ≤0.8 km, tee ≤4 km, branch ≤1 km) 23 Nov 2026Pipelines are linked on the Sodir facility ids. Pipeline ends without a continuation are linked into the nearest pipeline with the same medium within 4 km.
- Norwegian Offshore Directorate, wellbores with drilling facility (spudded in the last three years) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, licensees per field (current shares) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, fields: status, operator and supply base 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, mobile facilities (responsible company and Acknowledgement of Compliance) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, facilities 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, marketable production per field and month 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, reserves per field 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, transport pipelines 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, owners and operators of pipeline systems and plants (TUF) 23 Nov 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Hugin (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
- Norwegian Offshore Directorate, field description Fulla (Transport), curated by OESA 20 Feb 2026 · licence NLOD 2.0
Not in the data: Flow in each pipeline, which field's gas ends up in which country, and the buyers of oil and gas. Gas is mixed in the network, so a “possible route” is a pipeline connection, not measured flow.