Field · the network on the Norwegian shelf

Fulla

Fulla is a field in the North Sea, operated by Aker BP ASA. The map shows the owners, the pipelines, where the production comes ashore and the possible onward routes.

Show on the globeField pageFact page at the Norwegian Offshore Directorate

Remaining reserves
17.1 million Sm³ o.e.
as of 31 Dec 2025 · Sodir, reserves · 23 Nov 2026
Licensees
3
Sodir, licensees · 23 Nov 2026
Rigs that have drilled here in the last three years
2
Sodir, wellbores · 23 Nov 2026

The network

From owner to market. Links without their own label have their source in the column heading; curated, derived and possible links are labelled at the link.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in Sodir data
  • curated from Sodir's field description
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Licensees
  • Aker BP operator47.70%Aker BP ASA · unchanged since 27 Jun 2023
  • Equinor40.00%Equinor Energy AS · unchanged since 27 Jun 2023
  • ORLEN12.30%ORLEN Upstream Norway AS · unchanged since 27 Jun 2023
Sodir, licensees · 23 Nov 2026
The fieldSodir, fields · 23 Nov 2026; Sodir, production · 23 Nov 2026
Facilities and pipelinesSodir, facilities · 23 Nov 2026; Sodir, pipelines · 23 Nov 2026
Landfall
MarketENTSOG points in the gas panel · 23 Nov 2026; OESA pipeline graph · 23 Nov 2026
  1. The fieldFullaApproved for production
    Facilities and pipelines

    No facilities in service at Sodir

    Processed at Hugin curated, Sodir 20 Feb 2026

    • Hugin A – Yop-Y oil · 24″ · onward to Yop-Y · under installation
    • Hugin A – Statpipe HTT gas · 28″ · onward to Statpipe HTT · under installation
    Landfall
    Market
    • Possible routes for the gas
    • Dornum, Emden Germany
    • Dunkerque France
    • North Sea Entry Denmark

    The buyers of the oil are not in the data.

Transport according to Sodir's field description

The well stream will be routed by pipeline to the Hugin field for processing and further transport.

Quoted from Sodir's field description, updated 20 Feb 2026. Sodir, field description

Notes

Rigs

Rigs that have drilled on Fulla in the last three yearsSodir, wellbores · 23 Nov 2026; Sodir, mobile facilities · 23 Nov 2026

RigResponsible company (Sodir)Latest wellOperatorSpuddedWellbores, 3 yrs
Scarabeo 8Saipem30/11-F-6 HAker BP12 Sep 20263
Deepsea StavangerOdfjell Drilling25/1-14 EAker BP29 Jul 20252

Pipeline systems and plants

Pipeline systems and plants (TUF) that the field's pipelines belong to or that the production continues into, with the owners. “Onward” means that the production continues into it. The link comes from the pipelines in the map above. Possible onward routes are in a separate table: there is an onward pipeline connection, but the flow is not measured, and the gas is mixed in the network.

Pipeline systems and plantsSodir, pipeline systems and plants · 23 Nov 2026

NameTypeOperatorLinkOwners
Yggdrasil GassrørPipelineEquinoronwardAker BP 54.63%, Equinor 40.21%, ORLEN 5.16%
Yggdrasil OljerørPipelineEquinoronwardAker BP 68.30%, Equinor 24.36%, ORLEN 7.34%
Show 3 possible onward routesShow fewer

Possible onward routesSodir, pipeline systems and plants · 23 Nov 2026

NameTypeOperatorOwners
GassledJoint ventureGasscoPetoro (SDFI) 100.00%
Grane OljerørPipelineEquinorPetoro (SDFI) 42.06%, Vår Energi 28.22%, Equinor 23.54%, ConocoPhillips 6.17%
Oseberg TransportsystemPipelineEquinorPetoro (SDFI) 48.38%, Equinor 36.23%, TotalEnergies 12.98%, ConocoPhillips 2.40%

Fleet

Rigs drilling, offshore vessels at the facilities in the AIS picture 26 Nov 2026, 23:32 UTC and the supply vessels from the base in the last 30 days.

Rigs

Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 27 Nov 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 27 Nov 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 26 Nov 2026, 23:32 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026

Visits, latest day with data: 1 Oct

Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026

Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.

Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.

Events

Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.

Last 12 months (27 Nov 2025–27 Nov 2026). Rigs: derived by OESA from Sodir's wellbores. An event when a moveable rig spuds a development or exploration well for another operator, or more than 3 km from its previous wellbore in another field or licence. Moves between templates on the same field are not included. «Came from» is the rig's previous wellbore at Sodir. The responsible company is the one Sodir lists as responsible for the rig today, not necessarily the owner. Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 27 Nov 2026), exploration wells and discoveries (27 Nov 2026), wellbores with drilling rig and the company responsible for the rig (23 Nov 2026) and field status (23 Nov 2026).

Sources

All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.

Not in the data: Flow in each pipeline, which field's gas ends up in which country, and the buyers of oil and gas. Gas is mixed in the network, so a “possible route” is a pipeline connection, not measured flow.