NEO NEXT+ ENERGY E&P UK LIMITED holds stakes in 17 fields on the UK Continental Shelf. The map shows how the fields connect to facilities, pipelines and landfall.

Show on the globeNEO NEXT+ Energy in other countriesUnited Kingdom: all fields and companies

Calculated equity production, last 12 months, 11 of 12 fields and licences with production
0.002 million Sm³ o.e.
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Per day
42 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Fields with a stake
17
NSTA · 8 Oct 2026
Licences with a share or operatorship
16
NSTA · 8 Oct 2026

Estimate: Calculated by OESA, not figures from the company: for each field the share that applied in each month is multiplied by the production from NSTA (Aug 2025–Jul 2026), converted to oil equivalent and summed over 11 fields and licences. Some shares are stated as of 8 Oct 2026 and may have differed earlier in the period. Some shares are truncated by the source. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. Not included in the sum: 1 field or licence where the production does not cover the whole period or applies to another period. The figure applies in the United Kingdom and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Attribution: Contains information provided by the North Sea Transition Authority and/or other third parties.

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NSTA data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

NEO NEXT+ ENERGY E&P UK LIMITED17 fields with a stakeGroup: NEO NEXT+ EnergyRegistration number: GB-COH 00811900
Field and shareNSTA · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareFranklin 0%truncated by the sourcefield 2.19 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareElgin 0%truncated by the sourcefield 1.21 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareAlwyn North 0%truncated by the sourcefield 0.56 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareDunbar 0%truncated by the sourcefield 0.35 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareBruce 1%field 0.24 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareJura 0%truncated by the sourcefield 0.19 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareGrant 0%truncated by the sourcefield 0.17 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareEllon 0%truncated by the sourcefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareNuggets N1 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareNuggets N2 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 17Show fewer
  1. Field and shareNuggets N3 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareNuggets N4 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and sharePelican 100% in licence P239A licence share is not a field share.Shut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareMarkham 17%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareGlenelg 5%truncated by the source
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareAlwyn East 0%truncated by the source
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareForvie 0%truncated by the source
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

The group

NEO NEXT+ ENERGY E&P UK LIMITED belongs to the group NEO NEXT+ Energy.

The link is curated by OESA with a source · NSTA · 8 Oct 2026 · record

Licences

The licences where NEO NEXT+ ENERGY E&P UK LIMITED holds a share or is the operator. A licence share is not a field share.

LicencesNSTA · 8 Oct 2026

NameTypeOperatorLicensees
P208DunbarlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P239Nuggets N1, Nuggets N3, PelicanlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT+ ENERGY E&P UK LIMITED 100%
P268licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P276BrucelicenceSERICA ENERGY (UK) LIMITEDSERICA ENERGY (UK) LIMITED 98%, BP EXPLORATION OPERATING COMPANY LIMITED 1%, NEO NEXT+ ENERGY E&P UK LIMITED 1%
P281DunbarlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P284Dunbar, GrantlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P362Elgin, Franklin, GlenelglicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 46.17%, ITHACA SP E&P LIMITED 27.95%, CHRYSAOR PRODUCTION (U.K.) LIMITED 19.31%, NEO NEXT+ ENERGY (ZEX) LIMITED 4.38%, ONE-DYAS E&P LIMITED 2.19%
P416licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P491Nuggets N2licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT+ ENERGY E&P UK LIMITED 100%
P622Nuggets N1licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT+ ENERGY E&P UK LIMITED 100%
P666ElginlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 46.17%, ITHACA SP E&P LIMITED 27.95%, CHRYSAOR PRODUCTION (U.K.) LIMITED 19.31%, NEO NEXT+ ENERGY (ZEX) LIMITED 4.38%, ONE-DYAS E&P LIMITED 2.19%
P724licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P752Franklin, GlenelglicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY OIL TRADING LIMITED 52.9%, CHRYSAOR PRODUCTION (U.K.) LIMITED 33.27%, ITHACA UKCS LIMITED 8%, NEO NEXT+ ENERGY E&P UK LIMITED 5.83%
P1970licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 100%
P2220licenceCONOCOPHILLIPS (U.K.) HOLDINGS LIMITEDCONOCOPHILLIPS (U.K.) HOLDINGS LIMITED 49.05%, NEO NEXT+ ENERGY E&P UK LIMITED 35.11%, ITHACA EF LIMITED 15.85%
P2613licenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY OIL TRADING LIMITED 67.86%, ITHACA UKCS LIMITED 32.14%

Partners

The companies NEO NEXT+ ENERGY E&P UK LIMITED shares the most fields with, by current stakes in the source. NSTA · 8 Oct 2026

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United Kingdom

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.