Company · the network on the UK Continental Shelf

ITHACA SP E&P LIMITED

ITHACA SP E&P LIMITED holds stakes in 10 fields on the UK Continental Shelf. The map shows how the fields connect to facilities, pipelines and landfall.

Show on the globeUnited Kingdom: all fields and companies

Calculated equity production, last 12 months
2.32 million Sm³ o.e.
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Per day
40,000 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Share of production in the United Kingdom
3.98%
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Fields with a stake
10
NSTA · 8 Oct 2026
Licences with a share or operatorship
12
NSTA · 8 Oct 2026

Estimate: Calculated by OESA, not figures from the company: for each field the share that applied in each month is multiplied by the production from NSTA (Aug 2025–Jul 2026), converted to oil equivalent and summed over 8 fields and licences. Some shares are stated as of 8 Oct 2026 and may have differed earlier in the period. Some shares are truncated by the source. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. The figure applies in the United Kingdom and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Estimate: The calculated equity production divided by the total for all fields in the source (Aug 2025–Jul 2026), both in oil equivalent. The total for the country is over 233 of 289 fields with production in the period; 56 fields that started or stopped in the period are left out of both.

Attribution: Contains information provided by the North Sea Transition Authority and/or other third parties.

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NSTA data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

ITHACA SP E&P LIMITED10 fields with a stakeRegistration number: GB-COH 01504603
Field and shareNSTA · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareSchiehallion 11%truncated by the sourcefield 2.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareFranklin 27%truncated by the sourcefield 2.19 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareElgin 27%truncated by the sourcefield 1.21 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareCaptain 75%truncated by the sourcefield 1.12 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and sharePierce 7%truncated by the sourcefield 1.07 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareJade 17.57%field 0.73 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareCook 61%truncated by the sourcefield 0.091 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareAbigail 100%truncated by the sourcefield 0.037 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareGlenelg 27.95% in licence P362A licence share is not a field share.
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareRosebank 20%truncated by the sourceUnder development
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Licences

The licences where ITHACA SP E&P LIMITED holds a share or is the operator. A licence share is not a field share.

LicencesNSTA · 8 Oct 2026

NameTypeOperatorLicensees
P362Elgin, Franklin, GlenelglicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 46.17%, ITHACA SP E&P LIMITED 27.95%, CHRYSAOR PRODUCTION (U.K.) LIMITED 19.31%, NEO NEXT+ ENERGY (ZEX) LIMITED 4.38%, ONE-DYAS E&P LIMITED 2.19%
P559SchiehallionlicenceADURA OPERATIONS LIMITEDITHACA SP E&P LIMITED 35.3%, ADURA OPERATIONS LIMITED 34.67%, CHRYSAOR PRODUCTION (U.K.) LIMITED 30.03%
P666ElginlicenceNEO NEXT+ ENERGY E&P UK LIMITEDNEO NEXT + ENERGY RESOURCES UK LIMITED 46.17%, ITHACA SP E&P LIMITED 27.95%, CHRYSAOR PRODUCTION (U.K.) LIMITED 19.31%, NEO NEXT+ ENERGY (ZEX) LIMITED 4.38%, ONE-DYAS E&P LIMITED 2.19%
P1026licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 80%, ITHACA SP E&P LIMITED 20%
P1028licenceITHACA SP E&P LIMITEDITHACA SP E&P LIMITED 70%, ITHACA ENERGY (UK) LIMITED 30%
P1189licenceITHACA SP E&P LIMITEDITHACA SP E&P LIMITED 70%, ITHACA ENERGY (UK) LIMITED 30%
P1191licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 80%, ITHACA SP E&P LIMITED 20%
P1272licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 80%, ITHACA SP E&P LIMITED 20%
P1589licenceCHRYSAOR PETROLEUM COMPANY U.K. LIMITEDCHRYSAOR LIMITED 35%, CHRYSAOR PETROLEUM COMPANY U.K. LIMITED 32.5%, ITHACA SP E&P LIMITED 17.57%, ITHACA GSA LIMITED 14.93%
P1665licenceITHACA SP E&P LIMITEDITHACA SP E&P LIMITED 100%
P2403licenceADURA OPERATIONS LIMITEDITHACA SP E&P LIMITED 50%, ADURA OPERATIONS LIMITED 50%
P2532licence–ITHACA SP E&P LIMITED 61.35%, ANASURIA HIBISCUS UK LIMITED 19.33%, PING PETROLEUM UK PLC 19.33%

Partners

The companies ITHACA SP E&P LIMITED shares the most fields with, by current stakes in the source. NSTA · 8 Oct 2026

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United Kingdom

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.