ENERPLUS RESOURCES USA CORPORATION

ENERPLUS RESOURCES USA CORPORATION operates 9 fields in North Dakota as derived by OESA, without a stake of its own in the source. The method is given under the notes.

Show on the globeUnited States: all fields and companies

Oil, operated, Jul 2026
1,827,777 bbl
too low · Jul 2026 · NDIC · 8 Oct 2026
Gas, operated, Jul 2026
4,361,074 Mcf
too low · Jul 2026 · NDIC · 8 Oct 2026
Wells as operator, Jul 2026
1,098
Jul 2026 · NDIC · 8 Oct 2026

Too low: The source withholds the figures for confidential wells in some of the months, so the figure is too low.

Attribution: Source: North Dakota Industrial Commission, Oil and Gas Division

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NDIC data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

ENERPLUS RESOURCES USA CORPORATIONderived operator of 9
Field and shareNDIC · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareLittle Knife field 3.13 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareBailey field 2.07 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareAntelope field 2.07 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareJim Creek field 1.21 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and sharePhaelens Butte field 1.06 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareMandaree operator derived operator, no stakefield 1.01 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareHeart Butte field 0.99 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareEagle Nest operator derived operator, no stakefield 0.95 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareSpotted Horn field 0.92 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareHaystack Butte field 0.81 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 34Show fewer
  1. Field and shareMurphy Creek field 0.77 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareCedar Coulee field 0.63 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareLone Butte field 0.59 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareMcgregory Buttes operator derived operator, no stakefield 0.59 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareMoccasin Creek field 0.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareElk field 0.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and sharePembroke field 0.31 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareFour Bears field 0.30 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareBear Creek field 0.29 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareLone Tree Lake field 0.29 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  11. Field and shareEllisville field 0.25 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  12. Field and shareTyrone field 0.24 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  13. Field and shareBig Gulch operator derived operator, no stakefield 0.21 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  14. Field and shareBaker field 0.20 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  15. Field and shareSouth Fork operator derived operator, no stakefield 0.15 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  16. Field and shareMarmon operator derived operator, no stakefield 0.073 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  17. Field and shareLittle Muddy field 0.060 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  18. Field and shareDublin field 0.050 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  19. Field and shareManning field 0.044 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  20. Field and shareStrandahl field 0.039 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  21. Field and shareRanch Coulee field 0.034 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  22. Field and shareOtter operator derived operator, no stakefield 0.028 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  23. Field and shareClimax operator derived operator, no stakefield 0.007 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  24. Field and shareGood Luck operator derived operator, no stakefield 0.006 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United States

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.