DEVON ENERGY WILLISTON, L.L.C.

DEVON ENERGY WILLISTON, L.L.C. operates 20 fields in North Dakota as derived by OESA, without a stake of its own in the source. The method is given under the notes.

Show on the globeUnited States: all fields and companies

Oil, operated, Jul 2026
2,668,276 bbl
too low · Jul 2026 · NDIC · 8 Oct 2026
Gas, operated, Jul 2026
12,591,548 Mcf
too low · Jul 2026 · NDIC · 8 Oct 2026
Wells as operator, Jul 2026
2,128
Jul 2026 · NDIC · 8 Oct 2026

Too low: The source withholds the figures for confidential wells in some of the months, so the figure is too low.

Attribution: Source: North Dakota Industrial Commission, Oil and Gas Division

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NDIC data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

DEVON ENERGY WILLISTON, L.L.C.derived operator of 20
Field and shareNDIC · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareBanks field 2.17 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareAntelope field 2.07 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareBig Bend field 1.86 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareSiverston field 1.81 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareReunion Bay field 1.71 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareWestberg field 1.61 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareEast Fork field 1.45 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareAlger field 1.16 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and sharePhaelens Butte field 1.06 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareMandaree field 1.01 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 67Show fewer
  1. Field and shareSand Creek field 1.00 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareHeart Butte field 0.99 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareEagle Nest field 0.95 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareSpotted Horn field 0.92 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareGrinnell operator derived operator, no stakefield 0.92 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareHaystack Butte field 0.81 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareBriar Creek operator derived operator, no stakefield 0.79 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareCamp operator derived operator, no stakefield 0.79 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareVan Hook field 0.60 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareMcgregory Buttes field 0.59 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  11. Field and shareTodd operator derived operator, no stakefield 0.51 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  12. Field and shareGlass Bluff field 0.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  13. Field and shareMoccasin Creek field 0.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  14. Field and shareElk field 0.47 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  15. Field and shareLost Bridge field 0.46 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  16. Field and shareTobacco Garden operator derived operator, no stakefield 0.44 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  17. Field and shareRagged Butte operator derived operator, no stakefield 0.43 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  18. Field and shareBear Den field 0.42 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  19. Field and shareSouth Tobacco Garden operator derived operator, no stakefield 0.37 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  20. Field and shareClear Creek field 0.35 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  21. Field and sharePoe field 0.33 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  22. Field and sharePembroke field 0.31 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  23. Field and sharePainted Woods operator derived operator, no stakefield 0.30 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  24. Field and shareKeene field 0.27 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  25. Field and sharePatent Gate field 0.26 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  26. Field and shareRosebud field 0.26 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  27. Field and shareStony Creek field 0.24 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  28. Field and shareAlexander field 0.24 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  29. Field and shareSixmile operator derived operator, no stakefield 0.24 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  30. Field and shareSquires field 0.20 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  31. Field and shareForeman Butte field 0.18 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  32. Field and shareEightmile field 0.17 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  33. Field and shareWolf Bay field 0.16 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  34. Field and shareSandrocks operator derived operator, no stakefield 0.16 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  35. Field and shareSouth Fork field 0.15 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  36. Field and shareWilliston field 0.13 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  37. Field and shareRound Prairie operator derived operator, no stakefield 0.13 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  38. Field and shareAvoca operator derived operator, no stakefield 0.12 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  39. Field and shareHebron field 0.12 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  40. Field and shareCatwalk operator derived operator, no stakefield 0.11 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  41. Field and shareBull Butte field 0.11 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  42. Field and shareLast Chance field 0.091 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  43. Field and shareCow Creek field 0.070 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  44. Field and shareTwin Buttes operator derived operator, no stakefield 0.038 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  45. Field and shareRanch Coulee field 0.034 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  46. Field and shareSpring Creek operator derived operator, no stakefield 0.033 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  47. Field and shareSakakawea operator derived operator, no stakefield 0.024 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  48. Field and shareBuford field 0.022 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  49. Field and shareNameless field 0.014 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  50. Field and shareHardscrabble field 0.010 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  51. Field and sharePierre Creek field 0.009 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  52. Field and shareLake Trenton operator derived operator, no stakefield 0.009 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  53. Field and shareFlat Top Butte field 0.008 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  54. Field and shareHay Draw operator derived operator, no stakefield 0.007 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  55. Field and shareCovered Bridge operator derived operator, no stakefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  56. Field and shareSugar Beet operator derived operator, no stakefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  57. Field and shareBuckhorn field 0.003 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United States

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.