PERENCO UK LIMITED

PERENCO UK LIMITED holds stakes in 39 fields on the UK Continental Shelf. The map shows how the fields connect to facilities, pipelines and landfall.

Show on the globeUnited Kingdom: all fields and companies

Calculated equity production, last 12 months, 23 of 24 fields and licences with production
1.22 million Sm³ o.e.
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Per day
21,000 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Fields with a stake
39
NSTA · 8 Oct 2026
Licences with a share or operatorship
14
NSTA · 8 Oct 2026

Estimate: Calculated by OESA, not figures from the company: for each field the share that applied in each month is multiplied by the production from NSTA (Aug 2025–Jul 2026), converted to oil equivalent and summed over 23 fields and licences. Some shares are stated as of 8 Oct 2026 and may have differed earlier in the period. Some shares are truncated by the source. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Not included in the sum: 1 field or licence where the production does not cover the whole period or applies to another period. The figure applies in the United Kingdom and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Attribution: Contains information provided by the North Sea Transition Authority and/or other third parties.

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NSTA data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

PERENCO UK LIMITED39 fields with a stakeRegistration number: GB-COH 04653066
Field and shareNSTA · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareLeman 78%truncated by the sourcefield 0.64 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareWytch Farm 95%truncated by the sourcefield 0.57 million Sm³ o.e. Jul 2025–Jun 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareWest Sole 100%truncated by the sourcefield 0.27 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareMinerva 50%truncated by the sourcefield 0.16 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareHoton 25%field 0.089 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareIndefatigable 76.92%field 0.073 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareWollaston 66%truncated by the sourcefield 0.063 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareNeptune 15%field 0.059 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareWhittle 66%truncated by the sourcefield 0.059 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareApollo 50%truncated by the sourcefield 0.041 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 41Show fewer
  1. Field and shareBell 64.92%field 0.040 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareJohnston 71%truncated by the sourcefield 0.037 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareHyde 100%field 0.033 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareMercury 50%truncated by the sourcefield 0.031 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareCleeton 100%field 0.024 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareCeres field 0.019 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareNewsham 100%truncated by the sourcefield 0.016 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareBoyle 72%truncated by the sourcefield 0.013 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareLeman South 78%truncated by the sourcefield 0.012 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareIndefatigable South West 76%truncated by the sourcefield 0.010 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  11. Field and shareDavy 72%truncated by the sourcefield 0.005 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  12. Field and shareBrown 72%truncated by the sourcefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  13. Field and shareBaird 100%field 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  14. Field and shareAmethyst East 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  15. Field and shareAmethyst West 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  16. Field and shareRavenspurn South 100%
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  17. Field and shareTrent 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  18. Field and shareTyne North 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  19. Field and shareTyne South 100%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  20. Field and shareBeaufort 76%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  21. Field and shareBessemer 76%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  22. Field and shareNorth Davy 72%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  23. Field and shareRavenspurn North 71%truncated by the source
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  24. Field and shareArthur 70%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  25. Field and shareDavy East 60%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  26. Field and shareGawain 50%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  27. Field and shareBure 23%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  28. Field and shareThames 23%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  29. Field and shareWensum 23%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  30. Field and shareYare 23%truncated by the sourceShut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  31. Field and shareHelvellyn Shut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Licences

The licences where PERENCO UK LIMITED holds a share or is the operator. A licence share is not a field share.

Partners

The companies PERENCO UK LIMITED shares the most fields with, by current stakes in the source. NSTA · 8 Oct 2026

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United Kingdom

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.