Skip to content
OESAAnalysis

Company · the network on the UK Continental Shelf

NEO NEXT + ENERGY DELTA LIMITED

NEO NEXT + ENERGY DELTA LIMITED holds stakes in 19 fields on the UK Continental Shelf. The map shows how the fields connect to facilities, pipelines and landfall.

Show on the globeNEO NEXT+ Energy in other countriesUnited Kingdom: all fields and companies

Calculated equity production, last 12 months
3.09 million Sm³ o.e.
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Per day
53,000 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Share of production in the United Kingdom
5.30%
Estimate · Aug 2025–Jul 2026 · NSTA · 8 Oct 2026
Fields with a stake
19
NSTA · 8 Oct 2026
Licences with a share or operatorship
11
NSTA · 8 Oct 2026

Estimate: Calculated by OESA, not figures from the company: for each field the share that applied in each month is multiplied by the production from NSTA (Aug 2025–Jul 2026), converted to oil equivalent and summed over 18 fields and licences. Some shares are stated as of 8 Oct 2026 and may have differed earlier in the period. Some shares are truncated by the source. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. The figure applies in the United Kingdom and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Estimate: The calculated equity production divided by the total for all fields in the source (Aug 2025–Jul 2026), both in oil equivalent. The total for the country is over 233 of 289 fields with production in the period; 56 fields that started or stopped in the period are left out of both.

Attribution: Contains information provided by the North Sea Transition Authority and/or other third parties.

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NSTA data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

NEO NEXT + ENERGY DELTA LIMITED19 fields with a stakeGroup: NEO NEXT+ EnergyRegistration number: GB-COH 11021922
Field and shareNSTA · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and shareCulzean 32%field 4.49 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and sharePenguin East 25%field 1.05 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareShearwater 44%truncated by the sourcefield 0.94 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareClaymore 10.38%field 0.45 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareBlake 68%truncated by the sourcefield 0.41 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and sharePenguin West 25%field 0.38 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareShaw 58%truncated by the sourcefield 0.37 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareCayley 58%truncated by the sourcefield 0.17 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareScapa 99%truncated by the sourcefield 0.096 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareArbroath 58%truncated by the sourcefield 0.091 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 19Show fewer
  1. Field and shareWood 58%truncated by the sourcefield 0.033 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareTweedsmuir South 100%truncated by the sourcefield 0.032 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareBrechin 58%truncated by the sourcefield 0.030 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareArkwright 58%truncated by the sourcefield 0.023 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareGodwin 58%truncated by the sourcefield 0.020 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareMontrose 58%truncated by the sourcefield 0.019 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareCarnoustie 58%truncated by the sourcefield 0.002 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareBuchan 100% in licence P241A licence share is not a field share.Shut down
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareTweedsmuir 100%truncated by the source
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

The group

NEO NEXT + ENERGY DELTA LIMITED belongs to the group NEO NEXT+ Energy.

The link comes from the source · NSTA · 8 Oct 2026

Licences

The licences where NEO NEXT + ENERGY DELTA LIMITED holds a share or is the operator. A licence share is not a field share.

LicencesNSTA · 8 Oct 2026

NameTypeOperatorLicensees
P19Arbroath, Godwin, MontroselicenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 58.97%, ITHACA MA LIMITED 41.03%
P20MontroselicenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 58.97%, ITHACA MA LIMITED 41.03%
P241Buchan, Tweedsmuir, Tweedsmuir SouthlicenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 100%
P244licenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 100%
P291Arkwright, Brechin, Carnoustie, Cayley, Godwin, ShawlicenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 58.97%, ITHACA MA LIMITED 41.03%
P292Arbroath, WoodlicenceNEO NEXT + ENERGY RESOURCES UK LIMITEDNEO NEXT + ENERGY DELTA LIMITED 58.97%, ITHACA MA LIMITED 41.03%
P1807licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 55.5%, NEO NEXT + ENERGY DELTA LIMITED 44.5%
P2340licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 50%, NEO NEXT + ENERGY NORTH SEA LIMITED 25%, NEO NEXT + ENERGY DELTA LIMITED 25%
P2495licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 50%, NEO NEXT + ENERGY DELTA LIMITED 25%, NEO NEXT + ENERGY NORTH SEA LIMITED 25%
P2544licenceNEO NEXT+ ENERGY E&P NORTH SEA UK LIMITEDNEO NEXT + ENERGY OIL TRADING LIMITED 32.5%, NEO NEXT + ENERGY DELTA LIMITED 32%, NEO NEXT + ENERGY NORTH SEA LIMITED 18.01%, NEO NEXT + ENERGY RESOURCES UK LIMITED 12.5%, NEO NEXT+ ENERGY E&P NORTH SEA UK LIMITED 4.99%
P2614licenceADURA OPERATIONS LIMITEDADURA OPERATIONS LIMITED 55.5%, NEO NEXT + ENERGY DELTA LIMITED 44.5%

Partners

The companies NEO NEXT + ENERGY DELTA LIMITED shares the most fields with, by current stakes in the source. NSTA · 8 Oct 2026

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United Kingdom

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.