Production, last 12 months
0.001 million Sm³ o.e.
Converted · Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026
Per day
11 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026
Gas, last 12 months
645,409 Sm³
Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026

Converted: Converted from the source's figures (Aug 2025–Jul 2026). Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. UNMIG reports production per concession, and the entity here is the concession. Gas is in Sm³ as UNMIG gives it; oil and gasolina (under NGL) are given in kg and shown in tonnes (kg divided by 1,000).

Estimate: Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Attribution: Fonte: MASE – UNMIG, Produzione nazionale di idrocarburi. Licenza CC BY 4.0.

The network

From owner to landfall. Links without their own label have their source in the column heading; curated and derived links are labelled at the link.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in UNMIG data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Licensees per concession

A.C 17.AG

A share in a concession is not a field share.

UNMIG · 8 Oct 2026
The fieldUNMIG · 8 Oct 2026
Facilities and pipelinesUNMIG · 8 Oct 2026
Landfall
  1. The fieldA.C 17.AGProducing0.001 million Sm³ o.e. Aug 2025–Jul 2026operator: ENI
    Facilities and pipelines

    Regina 1 facility in service

    • Basil – Regina gas ·
    • Regina – Regina 1 gas ·
    Landfall

    The source does not show where the production comes ashore.

Production per month

The source's figures in the source's unit. The oil equivalents in the key figures are converted by the Norwegian Offshore Directorate's rule.

Production per monthUNMIG · 8 Oct 2026

MonthGas Sm³
July 2026107,140
June 202631,082
May 20267,390
April 202635,929
March 202680,435
February 202661,685
January 202662,139
December 202556,673
November 202547,839
October 202555,515
September 202551,588
August 202547,994
July 202567,864

Attribution: Fonte: MASE – UNMIG, Produzione nazionale di idrocarburi. Licenza CC BY 4.0.

Concessions

The concessions the field lies in, with the licensees as the source states them. A share in a concession is not a field share.

ConcessionsUNMIG · 8 Oct 2026

NameTypeOperatorLicensees
A.C 17.AGconcession (concessione di coltivazione)ENIENI 75%, ENERGEAN ITALY 25%

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for Italy

Not in the data: Flow in each pipeline, where the gas ends up, and the buyers of oil and gas.