Field · the network on the Norwegian shelf

Gudrun

Gudrun is a gas and condensate field in the North Sea, operated by Equinor Energy AS. The map shows the owners, the facilities, the pipelines, where the production comes ashore and the possible onward routes.

Show on the globeField pageFact page at the Norwegian Offshore Directorate

Marketable production, last 12 months
1.23 million Sm³ o.e.
Aug 2025–Jul 2026 · Sodir, production · 7 Oct 2026
Production Jul 2026
0.067 million Sm³ o.e.
Sodir, production · 7 Oct 2026
Gas, last 12 months
0.59 billion Sm³
Aug 2025–Jul 2026 · Sodir, production · 7 Oct 2026
Share of Norwegian production
0.501%
Estimate · Sodir, production · 7 Oct 2026
Remaining reserves
9.02 million Sm³ o.e.
as of 31 Dec 2025 · Sodir, reserves · 7 Oct 2026
Licensees
4
Sodir, licensees · 7 Oct 2026
Rigs that have drilled here in the last three years
1
Sodir, wellbores · 7 Oct 2026

Estimate: The field's marketable production over the last 12 months divided by the total for all fields (Sodir).

The network

From owner to market. Links without their own label have their source in the column heading; curated, derived and possible links are labelled at the link.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in Sodir data
  • curated from Sodir's field description
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Licensees
  • Equinor operator36.00%Equinor Energy AS · unchanged since 30 Dec 2015
  • Vår Energi25.00%Vår Energi ASA · unchanged since 8 Jun 2024
  • OMV24.00%OMV Norge AS · unchanged since 31 Oct 2013
  • Repsol15.00%Repsol Norge AS · unchanged since 30 Dec 2015
Sodir, licensees · 7 Oct 2026
The fieldSodir, fields · 28 Sep 2026; Sodir, production · 7 Oct 2026
Facilities and pipelinesSodir, facilities · 7 Oct 2026; Sodir, pipelines · 7 Oct 2026
Landfallderived: OESA pipeline graph
MarketENTSOG points in the gas panel · 7 Oct 2026; OESA pipeline graph · 7 Oct 2026
  1. The fieldGudrunProducing · Gas and condensate1.23 million Sm³ o.e. Aug 2025–Jul 2026Supply base: Dusavik
    Facilities and pipelines

    Gudrun 1 facility in service

    • Gudrun Gassrør gas · 14″
    • Gudrun Oljerør oil · 12″
    • Sleipner Kondensatrør condensate · 20″ · onward to Kårstø derived
    Landfall
    • Kårstø Norway · condensate derived
    Market
    • Possible routes for the gas
    • Easington United Kingdom
    • Zeebrugge Belgium
    • Dunkerque France
    • Emden Germany

    The buyers of the oil are not in the data.

Transport according to Sodir's field description

Unstable oil and rich gas are transported in separate pipelines to the Sleipner A facility for further processing. Dry gas is exported via Gassled (Area D) to the market, while oil is transported to the Kårstø terminal.

Quoted from Sodir's field description, updated 20 Feb 2026. Sodir, field description

Notes

Rigs

Rigs that have drilled on Gudrun in the last three yearsSodir, wellbores · 7 Oct 2026; Sodir, mobile facilities · 7 Oct 2026

RigResponsible company (Sodir)Latest wellOperatorSpuddedWellbores, 3 yrs
Shelf Drilling BarskShelf Drilling15/3-A-3Equinor22 Jul 20261

Pipeline systems and plants

Pipeline systems and plants (TUF) that the field's pipelines belong to or that the production continues into, with the owners. “Onward” means that the production continues into it. The link comes from the pipelines in the map above. Possible onward routes are in a separate table: there is an onward pipeline connection, but the flow is not measured, and the gas is mixed in the network.

Pipeline systems and plantsSodir, pipeline systems and plants · 7 Oct 2026

NameTypeOperatorLinkOwners
GassledJoint ventureGasscoonwardPetoro (SDFI) 100.00%
Sleipner KondensatrørPipelineEquinoronwardEquinor 59.60%, ORLEN 25.00%, Vår Energi 15.40%
Show 3 possible onward routesShow fewer

Possible onward routesSodir, pipeline systems and plants · 7 Oct 2026

NameTypeOperatorOwners
LangeledPipelineGasscoPetoro (SDFI) 100.00%
Zeepipe IPipelineGasscoPetoro (SDFI) 100.00%
Zeepipe TerminalTerminalGassconot allocated 51.00%, Petoro (SDFI) 49.00%

Fleet

Rigs drilling, offshore vessels at the facilities in the AIS picture 7 Oct 2026, 14:34 UTC and the supply vessels from the base in the last 30 days.

Rigs

Norwegian Offshore Directorate, exploration wells being drilled (NLOD 2.0), 7 Oct 2026 · Norwegian Offshore Directorate, wellbores spudded in the last 120 days (NLOD 2.0), 7 Oct 2026 · AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 7 Oct 2026, 14:34 UTC · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated: name match in AIS and SafeSeaNet, checked against the well) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026

Offshore vessels at the facilities

Within 2 km of a facility and under 1 knot. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset real-time picture) (NLOD 1.0), 7 Oct 2026, 14:34 UTC · Norwegian Coastal Administration, Kystdatahuset: reported voyages and register type (SafeSeaNet) (NLOD 1.0), 6 Oct 2026

Visits, latest day with data: 1 Oct

Rigs and offshore vessels that lay within 2 km of a facility at under 1 knot for at least 30 minutes, according to the AIS positions for 1 Oct 2026 from the Norwegian Coastal Administration. Kystdatahuset publishes the history about a week late. A visit shows that the vessel was there, not who it worked for. AIS from Kystverket (Norwegian Coastal Administration, Kystdatahuset historical positions) (NLOD 1.0), latest day 1 Oct 2026 · Norwegian Coastal Administration, Kystdatahuset: register type (SafeSeaNet) (NLOD 1.0), 1 Oct 2026 · Norwegian Offshore Directorate, facilities with position (NLOD 2.0), 7 Oct 2026 · OESA, rig key Sodir ↔ MMSI ↔ IMO (curated) (NLOD 1.0 / NLOD 2.0), 7 Oct 2026

Method: A visit is a continuous stay within 2 km of a facility at under 1 knot for at least 30 minutes, computed from the AIS positions. Gaps in the data of up to 60 minutes, or 3 hours when the vessel is in the same place before and after, do not count as interruptions. Hours are the sum of the visits. Only rigs and vessels with an offshore register type or registered with the Norwegian Offshore Directorate are included.

Supply vessels from the base, last 30 days

Reported departures by offshore vessels (register type in SafeSeaNet). Supply base: Norwegian Offshore Directorate (the field's main supply base); the port's position from the World Port Index, Wikidata or OpenStreetMap (NLOD 2.0 / offentlig eiendom / ODbL), 28 Sep 2026 · Norwegian Coastal Administration, Kystdatahuset: reported voyages and register type (SafeSeaNet) (NLOD 1.0), 6 Oct 2026

Who charters a rig or vessel, and at what rate, is not in open data. A vessel is linked to a field only when AIS shows it within 2 km of one of the field's own facilities or its host facility, at under 1 knot – that says the vessel was there, not who it works for. Facilities on the export route do not count. Tankers loading oil from production ships (FPSOs) and loading buoys are not included. Sodir often records the completion date of development wells late. A rig marked “probably drilling” spudded the well in the last 120 days but may have finished. Supply vessels per base are based on reported departures (SafeSeaNet). The destination is usually just the sea area (“Offshoreinst. Nordsjøen”, “… Barentshavet”), so the field the vessel supplies is not stated. Peterhead is British and has no departures in Kystdatahuset. AIS coverage offshore varies. A vessel without positions for a period may have been there without being recorded. Ship data: Norwegian Coastal Administration. Not for navigation.

Connected to

Projects

Events

Ownership changes, exploration wells and discoveries, rigs that move, production start-up and contracts, with a link to the source.

Last 12 months (7 Oct 2025–7 Oct 2026). Rigs: derived by OESA from Sodir's wellbores. An event when a moveable rig spuds a development or exploration well for another operator, or more than 3 km from its previous wellbore in another field or licence. Moves between templates on the same field are not included. «Came from» is the rig's previous wellbore at Sodir. The responsible company is the one Sodir lists as responsible for the rig today, not necessarily the owner. Sources: Norwegian Offshore Directorate (Sodir, NLOD 2.0): licence transfers (retrieved 7 Oct 2026), exploration wells and discoveries (7 Oct 2026), wellbores with drilling rig and the company responsible for the rig (7 Oct 2026) and field status (7 Oct 2026).

Economics

Estimated gross sales value of the field's marketable production, month by month.

Last 12 months
6.0 NOK bnestimateAug 2025–Jul 2026
July 2026
378 NOK mestimateBrent USD 83.76/bbl · gas EUR 54.0/MWh
Share of the shelf's value
0.509%estimatelast 12 months
Gas in the value
48%estimatelast 12 months

Oil and condensateGasNGL

02505007501,000August 2024: NOK 616 m · Oil and condensate 313 · Gas 291 · NGL 12September 2024: NOK 118 m · Oil and condensate 58 · Gas 57 · NGL 4.1October 2024: NOK 551 m · Oil and condensate 267 · Gas 269 · NGL 15Oct 24November 2024: NOK 671 m · Oil and condensate 307 · Gas 353 · NGL 11December 2024: NOK 667 m · Oil and condensate 288 · Gas 370 · NGL 8.7January 2025: NOK 740 m · Oil and condensate 327 · Gas 403 · NGL 11Jan 25February 2025: NOK 484 m · Oil and condensate 199 · Gas 279 · NGL 5.3March 2025: NOK 605 m · Oil and condensate 270 · Gas 324 · NGL 11April 2025: NOK 535 m · Oil and condensate 256 · Gas 270 · NGL 9.0Apr 25May 2025: NOK 535 m · Oil and condensate 251 · Gas 272 · NGL 13June 2025: NOK 519 m · Oil and condensate 248 · Gas 261 · NGL 11July 2025: NOK 516 m · Oil and condensate 247 · Gas 260 · NGL 9.4Jul 25August 2025: NOK 420 m · Oil and condensate 198 · Gas 214 · NGL 8.2September 2025: NOK 64 m · Oil and condensate 35 · Gas 25 · NGL 3.6October 2025: NOK 309 m · Oil and condensate 173 · Gas 124 · NGL 12Oct 25November 2025: NOK 450 m · Oil and condensate 212 · Gas 228 · NGL 9.7December 2025: NOK 483 m · Oil and condensate 239 · Gas 230 · NGL 14January 2026: NOK 537 m · Oil and condensate 243 · Gas 281 · NGL 14Jan 26February 2026: NOK 475 m · Oil and condensate 224 · Gas 235 · NGL 16March 2026: NOK 840 m · Oil and condensate 399 · Gas 424 · NGL 17April 2026: NOK 801 m · Oil and condensate 429 · Gas 356 · NGL 15Apr 26May 2026: NOK 799 m · Oil and condensate 394 · Gas 383 · NGL 22June 2026: NOK 459 m · Oil and condensate 226 · Gas 227 · NGL 5.9July 2026: NOK 378 m · Oil and condensate 196 · Gas 177 · NGL 5.4Jul 26378
Show as table
Estimated sales value per month (NOK m)
MonthOil and condensateGasNGLTotal (NOK m)
Jul 20261961775.4378
Jun 20262262275.9459
May 202639438322799
Apr 202642935615801
Mar 202639942417840
Feb 202622423516475
Jan 202624328114537
Dec 202523923014483
Nov 20252122289.7450
Oct 202517312412309
Sep 202535253.664
Aug 20251982148.2420
Jul 20252472609.4516
Jun 202524826111519
May 202525127213535
Apr 20252562709.0535
Mar 202527032411605
Feb 20251992795.3484
Jan 202532740311740
Dec 20242883708.7667
Nov 202430735311671
Oct 202426726915551
Sep 202458574.1118
Aug 202431329112616

The owners, last 12 monthsestimate

OwnerShareValue
Equinor36.00%2.2 NOK bn
Vår Energi25.00%1.5 NOK bn
OMV24.00%1.4 NOK bn
Repsol15.00%902 NOK m

Share: the equity share today. Value: estimated sales value of the share over the last 12 months, with the share in force each month.

Check against Statistics Norway

For the whole shelf the method gives NOK 1,180.9 bn for Aug 2025–Jul 2026. Statistics Norway's export value for crude oil, condensate, pipeline gas, LNG, propane and butane was NOK 1,107.3 bn, −6.2% against the estimate. Month by month the difference ranged from −10.5% (June 2026) to −1.0% (January 2026); Statistics Norway was below the estimate in all 12 months. Crude oil and condensate in the trade statistics (commodity numbers 2709.0009 and 2709.0001) were 93% of oil and condensate production, and pipeline gas (2711.2100) was 94% of gas production in the same months. On top of this, 4.35 million tonnes of LNG (2711.1100) were exported. Statistics Norway reports LNG only in tonnes, so it is not included in the gas percentage. The prices in Statistics Norway's export statistics differed on average by −0.8% from Brent and −0.7% from the gas price, but by up to −10.7% for oil in a single month (June 2026). Exports of propane and butane averaged 58% of NGL production converted to tonnes, so the NGL price only covers part of the products.

How the estimate is calculated

Estimated gross sales value, calculated by OESA: for each field and month, (oil + condensate) × 6.2898 bbl/Sm³ × Brent (USD/bbl) × USD/NOK, gas × 0.011111 MWh/Sm³ (40 MJ) × European gas price (EUR/MWh) × EUR/NOK and NGL ÷ 1.9 Sm³ o.e. per tonne × NGL price (NOK/tonne) are added up. A company's figure is the field value times the equity share in force on the 15th of each month, summed over the fields and the group's legal entities. These are not the companies' own figures. Prices in July 2026: Brent USD 83.76/bbl, gas in Europe USD 18.06/mmbtu (EUR 53.97/MWh), NGL NOK 5,142/tonne, USD/NOK 9.7064 and EUR/NOK 11.0822. Sources of error: Brent and TTF are benchmark prices. Actual sales prices depend on crude quality, timing of sales, contracts and hub (NBP, THE, PEG, ZTP). The production month is not the sales month: cargoes are lifted and sold at other times (over/underlift, storage). The energy content of gas is set to 40 MJ/Sm³ for all fields, and NGL to 1.9 Sm³ o.e. per tonne. Both vary between fields. NGL is priced with Statistics Norway's export price for propane and butane; ethane and other NGL products may have other prices. Transport tariffs (Gassled), tax (78%), costs and hedging are not deducted. The figure is market sales value, not netback at the field or profit. LNG from Melkøya is priced as pipeline gas.

Sources: Norwegian Offshore Directorate, marketable production per field and month, NLOD 2.0, 7 Oct 2026. U.S. Energy Information Administration, Europe Brent Spot Price FOB (RBRTE), via FRED (DCOILBRENTEU), Public Domain: Citation Requested (FRED), 7 Oct 2026. EIA lists «Refinitiv, an LSEG business» as the source of the spot prices. World Bank, Commodity Price Data (The Pink Sheet), monthly prices, «Natural gas, Europe», CC BY 4.0, 2 Oct 2026. From April 2015 the series is TTF (Netherlands), according to the World Bank's description in the file. Norges Bank, exchange rates (EXR), monthly average, NLOD 2.0, 7 Oct 2026. The licence is stated on the dataset «API for åpne data» at data.norge.no. Norges Bank's own open-data page states no licence. Statistics Norway, table 08799: External trade in goods by commodity number, imports/exports, country and month (exports, all countries), CC BY 4.0, 15 Sep 2026. Value ÷ quantity for exported propane (2711.1200) and butane (2711.1300). Statistics Norway notes that 0 may also mean the figure is confidential. The estimates are calculated by OESA and are not the companies' own figures.

Sources

All figures and links on the page come from these sources. Curated links are entered by hand by OESA from the source text, and the quote is checked against the source at every build.

Not in the data: Flow in each pipeline, which field's gas ends up in which country, and the buyers of oil and gas. Gas is mixed in the network, so a “possible route” is a pipeline connection, not measured flow.