Skip to content
OESAAnalysis

Company · the network in North Dakota

EMPIRE NORTH DAKOTA LLC

EMPIRE NORTH DAKOTA LLC operates 11 fields in North Dakota as derived by OESA, without a stake of its own in the source. The method is given under the notes.

Show on the globeUnited States: all fields and companies

Oil, operated, Jul 2026
15,633 bbl
too low · Jul 2026 · NDIC · 8 Oct 2026
Gas, operated, Jul 2026
1,825 Mcf
too low · Jul 2026 · NDIC · 8 Oct 2026
Wells as operator, Jul 2026
107
Jul 2026 · NDIC · 8 Oct 2026

Too low: The source withholds the figures for confidential wells in some of the months, so the figure is too low.

Attribution: Source: North Dakota Industrial Commission, Oil and Gas Division

The network

The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in NDIC data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

EMPIRE NORTH DAKOTA LLCderived operator of 11
Field and shareNDIC · 8 Oct 2026
Facilities and pipelines
Landfall
  1. Field and sharePatent Gate field 0.26 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareStarbuck operator derived operator, no stakefield 0.025 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareRoosevelt field 0.020 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareMorgan Draw field 0.012 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareWayne field 0.010 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareCooks Peak field 0.004 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareLanda operator derived operator, no stakefield 0.003 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareSherman field 0.003 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareSherwood field 0.003 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareNortheast Landa field 0.003 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Show all 22Show fewer
  1. Field and shareRussell field 0.002 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  2. Field and shareNorth Haas field 0.002 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  3. Field and shareLeonard operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  4. Field and shareWake operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  5. Field and shareNewporte operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  6. Field and shareUpper Des Lacs operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  7. Field and shareRoth operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  8. Field and shareSouth Starbuck operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  9. Field and shareZion operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  10. Field and shareThrums operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  11. Field and shareSouthwest Haas operator derived operator, no stakefield 0.000 million Sm³ o.e. Aug 2025–Jul 2026
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

  12. Field and shareNorth Roth
    Facilities and pipelines

    The source does not link facilities to the fields.

    Landfall

    The source does not show where the production comes ashore.

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for United States

Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.