Company · the network in North Dakota
CONTINENTAL RESOURCES, INC.
CONTINENTAL RESOURCES, INC. operates 43 fields in North Dakota as derived by OESA, without a stake of its own in the source. The method is given under the notes.
Attribution: Source: North Dakota Industrial Commission, Oil and Gas Division
The network
The fields with a stake or operatorship, with facilities, pipelines and landfall. Links without their own label have their source in the column heading.
- The colour shows the content:
- Gas
- Oil
- Condensate
- CO₂
- Oil and condensate
- The line shows the source:
- pipeline in NDIC data
- curated, with the source at the link
- possible onward route, not measured flow
- planned or not in service
The links show direction, not volume.
- Field and shareLittle Knife field 3.13 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSanish field 2.56 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareElidah field 2.34 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBanks field 2.17 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareAntelope field 2.07 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWest Capa operator derived operator, no stakefield 1.95 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareAlkali Creek field 1.87 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSiverston field 1.81 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWestberg field 1.61 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareEast Fork operator derived operator, no stakefield 1.45 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
Show all 115Show fewer
- Field and shareElm Tree operator derived operator, no stakefield 1.30 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareJim Creek operator derived operator, no stakefield 1.21 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePershing field 1.09 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareDollar Joe field 0.99 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBeaver Lodge field 0.95 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCorral Creek field 0.95 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareGrinnell field 0.92 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareTruax field 0.92 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHaystack Butte field 0.81 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCamp field 0.79 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareMurphy Creek field 0.77 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCrazy Man Creek operator derived operator, no stakefield 0.68 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBrooklyn operator derived operator, no stakefield 0.65 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareDimmick Lake field 0.63 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCedar Coulee operator derived operator, no stakefield 0.63 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareRoss field 0.63 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareEpping field 0.52 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareTodd field 0.51 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareRattlesnake Point operator derived operator, no stakefield 0.49 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareGlass Bluff field 0.47 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareElk field 0.47 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLong Creek operator derived operator, no stakefield 0.43 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareIndian Hill field 0.42 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareChimney Butte operator derived operator, no stakefield 0.42 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareNorth Tioga field 0.40 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCabernet operator derived operator, no stakefield 0.39 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCedar Hills operator derived operator, no stakefield 0.38 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBully field 0.35 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePoe field 0.33 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePembroke field 0.31 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareOakdale operator derived operator, no stakefield 0.30 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBear Creek field 0.29 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePatent Gate operator derived operator, no stakefield 0.26 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareRosebud field 0.26 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareStony Creek field 0.24 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBig Gulch field 0.21 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWillow Creek field 0.21 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBaker field 0.20 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCamel Butte field 0.20 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareNorth Tobacco Garden field 0.18 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareUpland operator derived operator, no stakefield 0.14 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWilliston field 0.13 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBell field 0.13 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareAvoca field 0.12 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSt. Demetrius operator derived operator, no stakefield 0.12 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareStoneview operator derived operator, no stakefield 0.12 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareTemple field 0.11 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCatwalk field 0.11 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareNoonan field 0.095 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLast Chance operator derived operator, no stakefield 0.091 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHamlet operator derived operator, no stakefield 0.089 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCorinth operator derived operator, no stakefield 0.077 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareMary field 0.071 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareFrazier field 0.068 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLeaf Mountain field 0.066 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareMedicine Pole Hills operator derived operator, no stakefield 0.058 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareFancy Buttes operator derived operator, no stakefield 0.055 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareRanch Creek field 0.055 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLindahl field 0.050 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePark field 0.050 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareEdge field 0.044 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareMondak field 0.043 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and sharePleasant Valley operator derived operator, no stakefield 0.042 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareNorthwest Mcgregor operator derived operator, no stakefield 0.039 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLarson field 0.038 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareViking operator derived operator, no stakefield 0.037 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareRanch Coulee field 0.034 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareT. R. field 0.027 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareElkhorn Ranch field 0.027 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBicentennial field 0.026 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSt. Anthony field 0.024 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareDutch Henry Butte field 0.021 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSauk operator derived operator, no stakefield 0.021 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSadler operator derived operator, no stakefield 0.018 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBeaver Creek field 0.018 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareDolphin operator derived operator, no stakefield 0.017 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWhiskey Joe field 0.014 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWildrose operator derived operator, no stakefield 0.010 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareJuno operator derived operator, no stakefield 0.010 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHardscrabble field 0.010 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareUkraina field 0.009 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBluffton operator derived operator, no stakefield 0.009 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareNorth Branch field 0.008 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHayland operator derived operator, no stakefield 0.006 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareDemores field 0.006 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareState Line operator derived operator, no stakefield 0.006 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSouth Meadow field 0.006 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareGooseneck field 0.006 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareLittle Missouri field 0.005 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBarta field 0.005 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHanson operator derived operator, no stakefield 0.005 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareHomesteaders Gap field 0.005 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareForthun field 0.004 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBorder operator derived operator, no stakefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareGlade field 0.004 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCold Turkey Creek operator derived operator, no stakefield 0.004 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBattleview operator derived operator, no stakefield 0.003 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareKimberly field 0.003 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareWhitetail operator derived operator, no stakefield 0.003 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBaukol Noonan operator derived operator, no stakefield 0.002 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareSaddle Butte field 0.002 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareFairfield operator derived operator, no stakefield 0.002 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareCharlie Bob operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBlacktail operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
- Field and shareBullsnake operator derived operator, no stakefield 0.001 million Sm³ o.e. Aug 2025–Jul 2026Facilities and pipelines
The source does not link facilities to the fields.
LandfallThe source does not show where the production comes ashore.
Notes
- Operated production in North Dakota in July 2026 (operator per well at NDIC, not an ownership share): 2,756 wells in 115 fields, 4,230,377 barrels of oil and 19,462,864 Mcf of gas from the wells with figures, summed by OESA from the well rows. Wells in WILDCAT are not included.
- The operator is derived, not stated by the source: NDIC gives the operator per well, not per field. OESA shows as operator the company operating the wells with more than half of the field's oil in NDIC's Monthly Production Report for July 2026 (gas when the field has no oil). It is not an ownership share.
- NDIC gives the operator of each well, not ownership shares. The companies' part of the production is therefore operated production, not ownership, and it is never treated as a share. A field gets an operator (marked derived) only when one company operates the wells with more than half of the field's oil in the latest month. When other companies have confidential wells in the field, it is not known who has the most. The oil sold (NDIC's Runs column, which is given for all wells, including the confidential ones) is then used instead, and this is stated at the field. If that does not show anyone with more than half either, the field is shown without an operator. The companies are listed with their names as NDIC writes them, and they are not linked to groups.
- The production is from NDIC's Monthly Production Report (Excel, one file per month, August 2025–July 2026), summed per field over the wells with figures: oil in barrels and gas in Mcf as NDIC gives them (the gas is produced gas, including gas that is flared). Each month is the Excel file as NDIC published it. NDIC states that later amendments are only in the PDF editions, so earlier months may differ slightly from them. Wells in WILDCAT (outside designated fields) and the oil in the SkimmedCrudeRecovery sheet (recovered at disposal wells) are not fields and are not included.
- Confidential wells are in the file without production figures (Oil, Gas, Wtr, Days and Flared are NULL), and NDIC withholds their production. For them NDIC gives only the oil and gas sold (Runs and GasSold). In July 2026 this applied to 255 of 22,466 wells. Fields with such wells show the sum of the reported wells, and this is stated at the field. For the operators the confidential wells are counted separately, and the sums there are marked «too low»; a figure NDIC withholds never becomes 0. The oil sold is only used to derive the operator where the production figures are not enough. NDIC's state totals in the PDF edition of the report are therefore higher than the sum of the fields here, and OESA shows no total for North Dakota as a whole.
- The fields in North Dakota are not in the map layers. The point for a field is the centre of the well positions NDIC gives, calculated by OESA, and it says nothing about the field's extent.
Sources
All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.
- NDIC – monthly production by well (North Dakota) North Dakota Industrial Commission, Oil and Gas Division · 8 Oct 2026No licence is stated with the data. The terms on the source's websiteAttribution: Source: North Dakota Industrial Commission, Oil and Gas Division
Not in the data: Flow in each pipeline, where the gas ends up, the buyers of oil and gas and the company's contracts.