Group · 3 countries
Sinopec
Sinopec has companies with stakes, operatorships or plants in Angola, China and Egypt in OESA's data. The figures apply to each country separately and are not the group's global production.
In other countries
The companies that belong to Sinopec outside the Norwegian shelf, according to OESA's data. Each country has its own source and period, so the figures apply to each country separately. They are not the company's global production, and they are not added up.
Angola
coarse data · retrieved 14 Oct 2026Companies- China Petrochemical Corp curated · GLEIF – LEI register (Level 1 and 2) · 14 Oct 2026 · LEI
Fields PAJ Oil and Gas Project 8% in the licence
Attribution: Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release
China
coarse data · retrieved 8 Oct 2026- Calculated equity production 2025, 1 of 3 fields and licences with production
- 0.060 million Sm³ o.e.
- Estimate · 2025 · GEM · 2 Mar 2026
Companies- China Petrochemical Corp curated · GLEIF – LEI register (Level 1 and 2) · 14 Oct 2026 · LEI
Fields Pucheng Oil Field 100% in the licence, Puguang Shale Gas Field 100% in the licence, Chunxiao/Shirakaba Oil and Gas Field 50%, Pinghu Oil and Gas Field 30%
Estimate: Calculated by OESA, not figures from the company: for each field the share that applied in each period is multiplied by the production from GEM (2025), converted to oil equivalent and summed over 1 field or licence. Some shares are stated as of 2 Mar 2026 and may have differed earlier in the period. Some shares are rounded by the source to whole percent. Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. Not included in the sum: one field where the share and the production are not at the same level (licence against field) and 1 field or licence where the production does not cover the whole period or applies to another period. The figure applies in China and is not the company's global production. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.
Attribution: Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release
Egypt
coarse data · retrieved 8 Oct 2026Companies- China Petrochemical Corp curated · GLEIF – LEI register (Level 1 and 2) · 14 Oct 2026 · LEI
Pipelines and plants 1 pipeline
Notes
- The companies in each country are linked to the group by LEI, registration number or curated with a source, never by name similarity. GLEIF consolidation concerns the accounts, not ownership shares, and never moves production.
- The figures apply to each country separately, with that country's period and source. They are not the company's global production, and they are not added up.
Sources
All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.
- Global Energy Monitor – Global Oil and Gas Extraction Tracker (GOGET) Global Energy Monitor · 2 Mar 2026Licence: CC BY 4.0Attribution: Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release
- Global Energy Monitor – Global Oil Infrastructure Tracker (GOIT) Global Energy Monitor · 15 Jun 2026Licence: CC BY 4.0Attribution: Global Oil Infrastructure Tracker - Oil/NGL Pipelines - June 2026 release.
- GLEIF – LEI register (Level 1 and 2) 14 Oct 2026Licence: CC0 1.0Attribution: GLEIF LEI data (CC0 1.0)