Country · coarse data
Bahrain
2 fields and 5 companies in Bahrain can be followed in OESA, with data from GEM. The figures are in the source's unit with period and source.
The data
What the source has for the country. What is not listed here is not in the data and is not filled in.
- Level
- Coarse data. International sources and curation with a source instead of the country's own authority. The figures are often annual, and the shares may be missing for some fields.
- Ownership
- per field, with shares
- Production
- per field and year, not all fields in the country
- Facilities
- not in the source
- Pipelines
- from the source
- Period for the totals
- 2023
- Retrieved
- 8 Oct 2026
Notes
What the sources and OESA say about the data for the country, including what is not used.
- The data are from GEM (Global Energy Monitor). Every figure has its source and year, and figures from different years are not mixed.
Fields
The fields in Bahrain with something to show. Fields with their own page are linked; the others can be followed on the globe.
FieldsGEM · 15 Jun 2026
| Name | Status | Operator | Production million Sm³ o.e., 2023, converted |
|---|---|---|---|
| Khuff Gas Field | Producing | Tatweer Petroleum | 10.1 estimate |
| Pre-Unayzah Gas Project | Discovery | Tatweer Petroleum | – |
Estimate: Converted from the source's figures (2023). Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Estimate: the source gives m³ without reference conditions, and the figure is treated as Sm³. The error can be up to about 5%. GEM itself converted the figure and unit GEM states to an annual volume for 2023. OESA has not converted it.
Attribution: Global Energy Monitor, Global Gas Infrastructure Tracker, October 2025 release; Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release; Global Oil Infrastructure Tracker - Oil/NGL Pipelines - June 2026 release.
Companies
The companies with a stake, operatorship or plants. Calculated production is OESA's estimate (share × production at the same level and for the same period).
CompaniesGEM · 15 Jun 2026
| Name | Roles | Fields with a stake | Units | Operator of | Calculated production million Sm³ o.e., estimate |
|---|---|---|---|---|---|
| Tatweer Petroleum | operator, licensee | 2 | 2 | 2 fields, 2 units | 10.1 2023 |
| Bahrain LNG | plant owner, plant operator | 0 | 0 | 0 | – |
| Bahrain Petroleum Co (Bapco) | plant owner | 0 | 0 | 0 | – |
| BlackRock | plant owner | 0 | 0 | 0 | – |
| Saudi Aramco | plant owner | 0 | 0 | 0 | – |
The total covers the fields where the share and the production are at the same level and for the whole period. Where it says, for example, “6 of 7”, one field or licence is not included; the reason is given with the figure when you follow the company.
Attribution: Global Energy Monitor, Global Gas Infrastructure Tracker, October 2025 release; Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release; Global Oil Infrastructure Tracker - Oil/NGL Pipelines - June 2026 release.
The sources
The licence and attribution are verbatim as each source requires.
- Global Energy Monitor – Global Gas Infrastructure Tracker (GGIT), LNG terminals Global Energy Monitor · 14 Oct 2025Licence: CC BY 4.0Attribution: Global Energy Monitor, Global Gas Infrastructure Tracker, October 2025 release
- Global Energy Monitor – Global Oil and Gas Extraction Tracker (GOGET) Global Energy Monitor · 2 Mar 2026Licence: CC BY 4.0Attribution: Global Energy Monitor, Global Oil and Gas Extraction Tracker, March 2026 release
- Global Energy Monitor – Global Oil Infrastructure Tracker (GOIT) Global Energy Monitor · 15 Jun 2026Licence: CC BY 4.0Attribution: Global Oil Infrastructure Tracker - Oil/NGL Pipelines - June 2026 release.