Skip to content
OESAAnalysis

Field · the network in Italy

Cellino Stoccaggio

Cellino Stoccaggio is a field in Italy, operated by Snam Stoccaggio.

Show on the globeFact page at Ministero dell'Ambiente e della Sicurezza Energetica – UNMIGItaly: all fields and companies

Production, last 12 months
0.005 million Sm³ o.e.
Converted · Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026
Per day
95 barrels o.e./day
Estimate · Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026
Gas, last 12 months
5,486,358 Sm³
Aug 2025–Jul 2026 · UNMIG · 8 Oct 2026

Converted: Converted from the source's figures (Aug 2025–Jul 2026). Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. UNMIG reports production per concession, and the entity here is the concession. Gas is in Sm³ as UNMIG gives it; oil and gasolina (under NGL) are given in kg and shown in tonnes (kg divided by 1,000).

Estimate: Oil equivalent by the Norwegian Offshore Directorate's rule: oil, condensate and NGL in Sm³ count equally, 1,000 Sm³ of gas = 1 Sm³ o.e. and 1 tonne of NGL = 1.9 Sm³ o.e. Per day: Sm³ o.e. × 6.29 barrels per Sm³ divided by the number of days in the period. Rounded to the nearest 10 below 1,000, the nearest 100 below 10,000 and the nearest 1,000 above that.

Attribution: Fonte: MASE – UNMIG, Produzione nazionale di idrocarburi. Licenza CC BY 4.0.

The network

From owner to landfall. Links without their own label have their source in the column heading; curated and derived links are labelled at the link.

  • The colour shows the content:
  • Gas
  • Oil
  • Condensate
  • CO₂
  • Oil and condensate
  • The line shows the source:
  • pipeline in UNMIG data
  • curated, with the source at the link
  • possible onward route, not measured flow
  • planned or not in service

The links show direction, not volume.

Licensees

The concession is not in UNMIG's list of titles (data as of 30 September 2026), so licensees and shares are not given. The production is from UNMIG's production file.

UNMIG · 8 Oct 2026
The fieldUNMIG · 8 Oct 2026
Facilities and pipelines
Landfall
  1. The fieldCellino StoccaggioProducing0.005 million Sm³ o.e. Aug 2025–Jul 2026operator: SNAM STOCCAGGIO
    Facilities and pipelines

    No facilities in service at UNMIG

    Landfall

    The source does not show where the production comes ashore.

Production per month

The source's figures in the source's unit. The oil equivalents in the key figures are converted by the Norwegian Offshore Directorate's rule.

Production per monthUNMIG · 8 Oct 2026

MonthGas Sm³
July 2026912,821
June 2026916,611
May 2026960,182
April 2026454,497
March 20260
February 2026670,466
January 20260
December 2025316,854
November 20250
October 20251,854
September 2025603,957
August 2025649,116
July 2025649,848

Attribution: Fonte: MASE – UNMIG, Produzione nazionale di idrocarburi. Licenza CC BY 4.0.

Notes

Sources

All figures and links on the page come from these sources. The licence and attribution are as each source requires. Conversions and calculations are OESA's own and labelled with the method.

All sources for Italy

Not in the data: Flow in each pipeline, where the gas ends up, and the buyers of oil and gas.