Fenja is an oil and gas field in the Norwegian Sea, discovered in 2014. Status: producing. Operator: Vår Energi ASA.
ProducingOil and gas
- Status
- Producing
- Contains
- Oil and gas
- Sea area
- Norwegian Sea
- Operator
- Vår Energi ASA
- Discovered
- 2014
- Approved for production
- 5 Apr 2018
- Production start
- 28 Apr 2023
- Supply base
- Kristiansund
- Sodir ID
- 31164879
Show on the globeFact page at the Norwegian Offshore Directorate
Production
- Last 12 months
- 0.44 million Sm³ o.e. · Sep 2025–Aug 2026
- Share of Norwegian production
- 0.181 %no. 59 of 100 fields with production in the last 12 months
- Per day
- 7,700barrels o.e. per day, converted
- Peak year
- 2024 1.16 million Sm³ o.e.
OilGasNGL2026 covers January–August (lighter bar).
Show the figures as a table
| Year | Oil | Gas | NGL | Condensate | Total |
|---|---|---|---|---|---|
| 2026 (Jan–Aug) | 0.24 | 0.02 | 0.01 | 0.00 | 0.27 |
| 2025 | 0.65 | 0.03 | 0.01 | 0.00 | 0.69 |
| 2024 | 1.10 | 0.05 | 0.01 | 0.00 | 1.16 |
| 2023 | 0.82 | 0.03 | 0.01 | 0.00 | 0.87 |
Marketable production in million standard cubic metres of oil equivalent (Sm³ o.e.), per month from the Norwegian Offshore Directorate, summed per year. Gas in billion Sm³ equals million Sm³ o.e. Figures up to and including August 2026. The conversion to barrels per day uses 1 Sm³ ≈ 6.29 barrels.
Reserves
The Norwegian Offshore Directorate's estimate as of 31 Dec 2025. Originally recoverable is everything the field is expected to produce; remaining is what is left.
| Product | Originally recoverable | Remaining | Unit |
|---|---|---|---|
| Oil | 5.69 | 3.14 | million Sm³ |
| Gas | 2.15 | 2.00 | billion Sm³ |
| NGL | 0.38 | 0.36 | million tonnes |
| Total o.e. | 8.57 | 5.82 | million Sm³ o.e. |
According to the estimate, 32 % of the recoverable reserves have been produced.
Licensees
| Company | Share | Valid from |
|---|---|---|
| Vår Energi ASAVAROperator | 50.00 % | 30 Oct 2026 |
| Concedo AS | 25.00 % | 30 Oct 2026 |
| DNO Norge ASDNO | 25.00 % | 30 Oct 2026 |
Companies on the analysis page link to their own page.
Network
Gas by pipeline to Kårstø and oil is loaded onto ships at Njord Bravo. The production is processed at Njord. Possible onward routes for the gas: Germany, France and Denmark (pipeline connections, not measured flow).
Source: Norwegian Offshore Directorate, pipelines, facilities and field descriptions, 11 Nov 2026. The network page has a source and date for every link.
Facilities
| Name | Type | Status | In service since |
|---|---|---|---|
| Fenja Gas Inj/Lift PLEM | Subsea structure | Under installation | 2021 |
| Fenja Production Plet | Subsea structure | Under installation | 2021 |
| Fenja Water Inj Riser Base | Subsea structure | Under installation | 2021 |
| Fenja G | Multi-well template | In service | 2023 |
| Fenja H | Multi-well template | In service | 2023 |
Sources
Sokkeldirektoratet, the Norwegian Offshore Directorate (FactMaps and FactPages), Norwegian Licence for Open Government Data (NLOD). Field data retrieved 4 Nov 2026, production 28 Oct 2026, licensees and reserves 11 Nov 2026. factpages.sodir.no · NLOD